Laserfiche WebLink
3 <br /> CLOSED CM WORR ORDSRS RSppRT <br /> Total Utility Maintenance Management S•:stem <br /> 12/03/1997 Page 1 <br /> ____________________________________________________________________________=___ <br /> Date Range :O1/09/1989 - 11/21/1997 <br /> CM Work Order Range :1001091070001 - UT2830-30-322Pattern :7101236730241 <br /> Item Range :<Blank> - WVL3694L05 Patter.n :* <br /> Proqram ALL Function ALL Activity ALL <br /> -------------=----=--------�________=__________________=_=_____=____________--- <br /> CM WORK ORDER ID: 77.01236730'l41 Title: INSTALL 3040 TULALIP AVENUE <br /> «DUPLICATE PRINTIHG OF THIS WORK ORDE;R» <br /> Ztem ID: -- <br /> Location ID: -- <br /> Program 710 Function 123 A::tivity 673 <br /> Date Completed: 10/31/1997 <br /> Overall Craft: <br /> Issued: 10/13/1997 Issued by: HDA Assigned to: P,A <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: o hours <br /> Status: HN <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> - ---- ------------------------------ ----------- <br /> � 0.00 17.00 343.91 <br /> HEO AAL ARNOLD AR'PHUR L <br /> DLI ACC AYERS, CHAD CARLSON 0.00 13.00 104.00 <br /> SDP1 AGA AHLES, GREGORY A. 0.00 5.00 111 .80 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 15.50 303.49 <br /> UL NCR NIETHAMER, CHARLES R. 0.00 4.00 63.12 <br /> EO SDK STUART, DARRELL K. 0.00 4.00 76.60 <br /> Total Labor Cost: 1002.92 <br /> liateri al s: <br /> ID Description Date # Used Cost <br /> ----- ------------------------------ -------- -------- <br /> / / ------6.48 <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8" 10 18 1997 24 <br /> CEME00061438 CEMENT 20 MIN. SE'l 50 LB. BAG 10/18/1997 2 23 .68 <br /> N/A CB 15 (ASSOC) 10/15/1997 1 212,27 <br /> N/A 1"X4"X8" RED BRICK 10/18/1997 5 0.00 <br /> N/A RING/COVER (SATHER) 10/20/1997 1 310. 10 <br /> PIPE46304:.'47 PIPE 8" PVC SEWER 10/15/1997 6����p <br /> PIPE46304347 PIPE 8" PVC SEWER 10/18/1997 26 55. 12 <br /> Total Materiai Cost: _ 745.45 <br /> saa .3� <br /> Vehicies: �- <br /> ID Description Hours Cost �3 AS <br /> ------------ ------------------------------ ------ -•--------- <br /> V0010 '92 GMC S10 PU 5.00 27.00 <br /> V2230 91 FORD FS00 DUMP 5 YARD 15.50 167.40 <br /> V2231 90 FORD DUMP 5-YARD 4.00 41.60 <br /> V3507 SS CASE BACKHOE 4X4 17.00 627.30 <br /> VJ0004 '95 CHEV 1-TON 17.00 100. 30 <br /> Total Vehicle Cost: 9E3.60 <br />