Laserfiche WebLink
' . REPAIR SP�FICATZONS aND LIST OP WO�TO SE BID <br /> • Page 5 of 6 <br /> Address: 3430 Tulalip Dr. <br /> More floor coverings. Instrall $15 per square yard jude <br /> back carpet (retail price of carpet; pad and <br /> installation extra) over 1/2" rebona pad to the dining, <br /> living room, first floor hallway and bedroom, and <br /> stairway complete with metal moldings and base. Owner <br /> ko select carpet style and colors. Contractor is <br /> responsible to cut door bottoms to complete all new <br /> floor covering installation. <br /> � �,c <br /> g ,-�L•_ :�. <br /> �3. Insulation, doors & Windows Insulation. Install <br /> R-19 insulation between the floor joists in the basement <br /> using metal rods for installation. Cover the bottom of <br /> the new insulation with 1/2" gypsum wallboard, tape and <br /> spackle providing a light textured ceiling over the <br /> entire basement. <br /> Doors. Remove the basement door at the rear of the <br /> house and install a white prehung steel flush panel <br /> door , Peachtree door or equal, complete with polished <br /> brass lockset and single cylindec deadbolt, both keyed <br /> alike. Repair rotted wood mzterials in this area and <br /> finish new door installation with trim and <br /> weatherstripping. Install the same type lockset and <br /> deadbolt to the house front door. Replace the house <br /> south entry door knob with the same type lockset, <br /> Schlage or equal Al.l new locks and deadbolts in all <br /> three doors to be keyed alike. ' <br /> Windows. Install new white enamel replacement window <br /> units (with thermo break) and raw insulated units, <br /> �tilgard or equal, in the following locations: Dinin <br /> � room - north wall single hung, east wall insulated unit; <br /> • Kitchen - east wall single hung , south wall over sink <br /> horizontal slider and south wall over fridge insulated <br /> unit; Family room - south wall insulated unit, replace <br /> door with new white enamel (thermo break) 6 ' 0" patio <br /> door and screen; Bathroom - west wall single tiung <br /> obscure glass; Bedtoom (first floor) - north wall _ <br /> casement unit in one k�indow and an insulated unit in the <br /> other, west wall casement unit; Living room - north wall <br /> insulated unit, east wall insulated unit; Upstairs <br /> bedroom (south) - remove the center wood pieces between <br /> the two windows and install a 4 ` 0" x 4 ' 6" white enamel <br /> insulated ,�indow (thermo break) , horizontal slider , <br /> complete with wood trim; UpstaiLs bedroom (north) - <br /> install a mil finish insulated conversion kit into <br /> existing window. All new opening replacement units <br /> �shall be with screens. <br /> All new work in this item sh.�ll conform to the . locally <br /> adopted codes. � <br /> $ � 1 `77 �_ � <br /> 9 , Painting Exterior . Remove the holly tre� at the <br /> north end of the house . Power wash down the entire <br /> house exterior , scrape areas with loose paint. Give the <br /> entire house two coats of paint; the first coat an oil <br /> base primer and t.he second coat a flat oil base house <br /> paint. Allow owner to select two colors; one for the <br /> trim and the other for the main painted areas of the <br /> house. Repair the metal canoFy over the south entry <br /> docr. and prime and coat with a final coat of apptopriate <br /> paint. <br />