Laserfiche WebLink
- t <br /> 2. SCRS does not yet have an executed lease agreement with the Ciry. An executed lease <br /> agreemcnt is required prior to the issuance of permits for the new tower. The existing <br /> tenan�s must be able ro relocate to the new tower. <br /> 3. A structural building permit is required for ihe foundation of the new tower. <br /> -'+. Any equipment building(s) required for the tower must be screened from view of the <br /> adjacent properties, either with a'solid site-'obscuring f�i ce or landscaping,o�'a <br /> combination of both. A landscaping/scrcening plan must bc reviewed and approved by the <br /> Planning Department prior to issuance of auy building permits. [Zoning Code, Chapter <br /> 41.150.D (l.c)]. <br /> 5. The proposal rt�ust also comply with all other City Code and Ordinance requirements not <br /> specifically set r'orth herein. <br /> Right to AppeaL• The applicant or owner of property located adjacent to the subject property or <br /> any property owner who deems himself aggrieved and will thereby suffer a direct impact from <br /> Qie proposal may appcal die Planning Director's determination as to whether or not the proposal <br /> should bc approved. Any such appcal must be filed within fourteen (14) days of the date <br /> spccified below. Appcal fonns are availaUlc Gom tt:c Planning Office at 3200 Cedar Street,ZnJ <br /> Floor, Everett, and must Uc submitted along with the required filing fee. Por more informalion <br /> concerning this dctcrmination, contact Faheem Siddiq at the Planning Departmcnt (425) <br /> 257-S731. <br /> Signed�� _ �� . � <br /> Paul A Robcrts irector <br /> Datc: July l0, 2000 <br /> spu01•01 Ino�icclfahccm�j�r <br /> � � <br /> �i <br /> 9 <br />