Laserfiche WebLink
i <br /> CIASED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 10/12/1994 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range :10/O1/1992 - 10/14/1994 <br /> CM Work Order Range :<Blank> - 84054210802�9 Pattern :2001181070001 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> -------------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 2001181070001 Title: INSTALL 36" B/F VALVE #2 VALVE HOIISE. <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» 3�3� T,,,,�,.,��, ,4.� <br /> Item ID: -- <br /> Location ID: -- <br /> Program 200 Function 118 Activity 107 � <br /> Date Completed: 10/12/1994 <br /> Overall Craft: SUPII <br /> Issued: 03/17/1994 Issued by: TJC Assigned to: GJ <br /> Ou'�. of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> � Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Complaint: <br /> -------------------------------------------------------------------------------- <br /> DUE TO SYSTEM SEPARATION, THE PROBLEM OF FURNIuHING WATER TO RES.04 VIA THE <br /> #2-LINE MAKES IT NECESSARY TO INSTALL A STOP VALVE IN THE OVERFLOW LINE <br /> AT #2 VAL`JE HOUSE. REMOVE A PORTION OF THE 48" LINE BETWEEN THE VALVE HOUSE <br /> AND THE ATMOSPHERIC VENT STRUCTURE.INSTALL TWO 36X48" TRANSITION FITTINGS AND <br /> 36" BUTTERFLY VALVE REMOVED FROM THE 5-LINE AT LAKE CHAPLAIN. <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost � <br /> ----- ------ ------------------------------ --=-------- ---------- ---------- <br /> WST AGE ALLEN, GARY E. 0.00 25.00 493.25 <br /> UL BBA BRADLEY, BROCK A. 0.00 29.00 396.43 <br /> EO CCL CRAIG, CHESTER L. 0.00 38.00 687.42 <br /> WELD DGL DISETH, GARALD L. 0.00 62.00 1346.64 <br /> UL DMJ DOUCETTE, MARK J 0.00 7.00 91.14 <br /> SUP2 GJ GARZA, JOHN (NMI) 0.00 22.00 525.58 <br /> HEO JRM JOHNSON, RICHARD M. 0.00 17.00 327.08 <br /> UL OHJ 0'LEARY, BRIAN J. 0. 00 16.00 208.32 <br /> WQCO ORJ OSBORNE, RICK J. 0.00 1.00 20.41 <br /> EO PTN PINON, THOMAS N. 0.00 32 .00 547.52 <br /> UL SSJ SMITH, STEVE J. 0. 00 15.00 215.25 <br /> HEO WMF' WELLMAN, MARK F. 0. 00 34.00 634.44 <br /> SIIP1 WMW WARD, MICFIAEL W. 0.00 34.00 670.82 <br /> Total Labor Cost: . 6164 .30 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> N/A TOP COARSE (FROM STOCK) 05/18/1994 1 225.00 <br /> Total Material Cost: 225.00 <br /> � <br />