Laserfiche WebLink
� <br /> • '. <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Wor�;s approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �onnect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Conne�t all rooftop downspouts to the side sewer. <br /> 8. J Connect ro�ftop downspouts to the drainage system provided for this lot. <br /> 9 Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> /� routing prior to beginning the project. <br /> /� 11 Install erosion controi measures as determined by the Public Works inspector, such as silt <br /> � tence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control me�sures per City of Everett Standards for small parcels <br /> �3 /Remove erosion control measures upon completion of the project prior tc final approval of the <br /> � permit. <br /> 14.;All excavated material from foundation, sidewalk and driveways shall be hauied to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Instali a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this buiiding's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity ilow across the public right-of-way. <br /> 21.'A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> �✓' ��d� � �,�� �� ' <br /> a'1;c:;mrren's <br />