My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7520 TYEE RD 2016-01-01 MF Import
>
Address Records
>
TYEE RD
>
7520
>
7520 TYEE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:49:10 AM
Creation date
3/8/2017 7:49:05 AM
Metadata
Fields
Template:
Address Document
Street Name
TYEE RD
Street Number
7520
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. ,�s per Public Works approved plan dated <br /> 5. Connect side sewer Fzr Ciry Standard #601. <br /> � Connec; side sewer per City Standard It's 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewe�. <br /> C'8.�Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Menual 3-2.6.2. Width _, Depth _, Length_ <br /> 10. The contractor must meet with the Public Works In,pector to discuss potential drainage <br /> routing prior to beainning the project. <br /> 11. install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw b21es, sw2les, or arosion blankets. <br /> 12 install erosion control measures per City of F_verett Standards for small parceis <br /> �13)Remove erosion control measures upon completion of the project prior to final approval of the <br /> - permit. <br /> 14. II excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> � approved, permitted site. No wasting of material is aliowed or, this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works inspector (i.e. all unused <br /> driveways and any broken or damaged area must be repiaced). <br /> 16. Install a Type I concrete ariveway per City of Everett Standard #307. <br /> �Pave driveway frcm the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan n402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flo��o across the public right-of-way, <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> :,:,����_-:5 �s�-v i y�-Z. iz v ��, f �! <br />
The URL can be used to link to this page
Your browser does not support the video tag.