Laserfiche WebLink
� <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> ((�onnect side sewer per City Standard #601. <br /> �� <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> (8 Connect rooftop downspuuts to the drainage system provided for this lot. <br /> `9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.E2. Width_, Depth_, Lennth_ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for smali parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> � AII exca:��ted material from foundation, sidewalk and driveways shall be hauled to an <br /> �� approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Worics Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). ' <br /> 16. Install a Type I concrete driveway per Cih�of Everett Standard #307. <br /> �7. Pave driveway from the front propeity line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Stan,iard Plan iW10 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � <br /> P'JlComments ( 7..� � <br /> \ l� <br />