Laserfiche WebLink
CLOSLD CM WORK GitDERS REPORT <br /> Total Utility Maintenance Management System <br /> 10/G9/1998 Page 1 <br /> Date Range Oo/24/1900 - 10/09/1998 <br /> CM Work Order Range : 0810800810001 - UT2837-02- Pattern :7101196751488 <br /> Item Rance : <Blzink> - WVL3694L05 Pattern : * <br /> Program ALL I'unction ALL Activity ALI <br /> ------------ <br /> CM WORK ORDER ID 7101196751488 Title: RENEW . 75 INCH 3725 UPLAND AVE <br /> «DUPLZCATE PRINTING OF THIS WORK ORDER» <br /> Item IL : WS3494XOOE -- WATER SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> D�te Completed: 08/24/19?8 <br /> Overall Craft : <br /> Issued: 06/22/1998 Issued bv: GJ Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0 . 00 Hr. ' <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status : <br /> i <br /> Labor: � <br /> Craft ZD Name Planned Hrs Actual Hrs Cost <br /> ------------ ---------- --------- - <br /> ----------- � <br /> WST BBA BRADLEY, BROCK A. 0 . 00 . 2 .00 41 .24 <br /> UL CJE CASE, JAMES E. 0 . 00 2 . 00 32 .40 <br /> SUP2 GJ GARZA, JOi-I'Q (NP9T) 0 . 00 2 . 00 53 . 04 <br /> DLI MTL2 MARKHAM, TIMOTHY L. 0 . 00 2 . 00 19 .00 j <br /> EO PTN PINON, THOMAS N. 0 . 00 2 . 00 40. 18 � <br /> HEO SR SIERRA, RAb40N (NP'1I) 0 . 00 2 . 00 42 . 10 <br /> HEO WMF WELLMl1N, MARK F• 0 . 00 2 . U0 41 . 82 <br /> Total Labor Coat : 269.78 <br /> Materials: <br /> ID Description Date # Used Cost <br /> --------------------- -------- -------- --- <br /> ADAF34000347 ADAPTER 3/4" CST X INSTA-TITE� 07/O1/1998 1 8 .21 <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE� 08/12/1998 1 8 .21 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITEc� 07/O1/1998 1 7 .67 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE� 08/12/1998 1 7.71 <br /> COUP34004047 COUPLING 3/4" 1/8 BEND COPPERCW 08/12/1998 1 6 . 57 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ 07/O1/1998 1 4 . 16 <br /> FIPE34060647 PIPE 3/4" POLY I .P.S. 07/O1/19?8 6 1 . 08 <br /> PLUG34122647 PLUG 3/4" BRASS NPT " OB/13/1998 1 1 . 04 <br /> Total Material Cost: 44 . 65 <br /> Vehiclea: <br /> ZD Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V0017 94 FORll AEROSTAR VAN 2 . 00 9.40 <br /> V2150 87 FORD 2 TON W/CRANE 2 . 00 11 . 80 <br /> V222G 88 FORD DUMP 5 YARD 2 . 00 20 .40 <br /> VH0009 97 CAT BACKIIOE 2 . 00 56 .80 <br />