My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7420 UPPER RIDGE RD 2016-01-01 MF Import
>
Address Records
>
UPPER RIDGE RD
>
7420
>
7420 UPPER RIDGE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 8:24:12 AM
Creation date
3/8/2017 8:24:09 AM
Metadata
Fields
Template:
Address Document
Street Name
UPPER RIDGE RD
Street Number
7420
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIASED CM '•�O:.K ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 07/26/1994 Page 1 <br /> --------------------------------------------------------------- - <br /> Date Range : 07/O1/1992 - 07/:.6/1994 <br /> CM Work Order Range :<Blank> - 8405421080229 Pattern :7401196750945 <br /> Item Range :<81ank> - WW22o20001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> _______________________________________________• ----- <br /> - --------------------------- <br /> CM WORK ORL':R ID: 7401196750945 Title: REPAIR 7420 UPPER RIDGE ROAD <br /> «DUPLICATE PRZNTZNG OF THZS WORK ORDER» <br /> Item ID: WS12E4K004 -- WATER SERVICE <br /> Location ID: -- <br /> Proqram 740 Function 119 Activity 675 <br /> Date Completed: 07/14/7_994 <br /> Overall Craft: <br /> Issued: 07/14/1994 Issued by: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> � Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ^----- ------------------------------ ----------- ---------- -------•--- <br /> UL NSO NIELSEN, SCOTT O. 0. 00 2.00 29.12 <br /> UL TDE1 THOMPSON, DWAYNE E. 0.00 2.00 28 .70 <br /> Total Labor Cost: 57.82 <br /> Matarials: <br /> ' ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> � ADAP34000447 ADAPTER 3/4° IPS UNION INSTA @ 07/14/1994 1 8.32 <br /> ' ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 07/14/1994 1 7 .80 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE@ 07/14/1994 1 7. 13 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ 07/14/1994 1 5. 67 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 07/14/1994 15 3.75 <br /> VALV34123847 VALVE BALL 3/4" BRONZE BODY " 07/14/1994 1 6.22 <br /> Total Material Cost: 38.89 <br /> Vehicles: <br /> ID Description Date Flours Cost <br /> ------------ ---------^-------------------- -------- ------ --• ------- <br /> V2139 SVC TRUCK CHEV 86 07/14,�1994 2.00 10.20 <br /> Total Vehicle Cost: 10.20 <br /> Work Description: <br /> -----------------------------------------------------^-------------------------- <br /> CONTRACTOR TORE SERVICE LINE OUT. <br /> Total c.ost for work order 7401196750945: ' 106.91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.