My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7426 UPPER RIDGE RD 2016-01-01 MF Import
>
Address Records
>
UPPER RIDGE RD
>
7426
>
7426 UPPER RIDGE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 8:25:39 AM
Creation date
3/8/2017 8:25:30 AM
Metadata
Fields
Template:
Address Document
Street Name
UPPER RIDGE RD
Street Number
7426
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � PUBLIC WOFiICS DEPARTMENT � <br /> UtiliHes Division,3200 Cedar Street <br /> EvereN WA 982U1 <br /> 425-257-6800 <br /> i <br /> Receipt N � l�C{/ 9 Date Paid //-�(D �D �_ <br /> d Cost of Work Order 1,098.00 Work Order# <br /> Cost of Service Order Se�vice Order ti <br /> Contact Person Win Lessley Telephone k 206-799-6229 1 <br /> Requested By Gordon Witcher Date of Request 6-26-03 <br /> Property Owner(name) Adai�Ente�prises <br /> Charge Cost to(name if different than owner) <br /> Address 17032 35�^Ave SE City Pothell Zip 98012 <br /> Installation Location 7605 Upper Ridge Road <br /> Inscallallon rype/descripHon/size/c�c. #6— Kiil existing service ior 7508 at mafn. Restore asphalt <br /> i <br /> 1 <br /> ❑ The following estimate is based upon the UHlities Division providing all labor, equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the Cit�f Everett Utilities Division 10 working days in advance o:required installation <br /> date to allow for scheduling and parts procurement i <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and � <br /> adminishaHve cnsls, the deEicit shall be charged to the property for which such installation was made and the i <br /> owner thereof, and provided further, that any excess payment shall be retumed to the person applying for the <br /> installation. I <br /> 'Dcposit must be paid prior to ordering puts or scheduling work. � <br /> WATER METFRS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: I31dg. Permit Center I <br /> Material 350.00 � <br /> Mark Sadler S <br /> LaL•or and Benefits 557.00 Kirk 13rooks <br /> Gordon Witcher <br /> Gquipment Ren[al 172.00 Robert iNaddle <br /> j'1� 19.00 Matt l�'clborn <br /> Paul rIcK�ECOR�'� � <br /> TOTAL $1,098.00 Gerry Crum <br /> �Uan Locke�Y 2 +� q�L <br /> // EWT <br /> / Y ' � <br /> Prepared by: Gerry Crum / .��---Date Gstimate Prepared 6-26-03 <br /> Accepted bc: Representing _ <br /> ESTIb1ATE GOOU FOR 6 �tONTHS / / <br /> s�..c.mm,�.n�,�=,rc,,,��,��rnun<.e.�,��ou� b of lv <br />
The URL can be used to link to this page
Your browser does not support the video tag.