Laserfiche WebLink
16 <br /> 4. A one yeaz watranty is required on the public sveet, water, sewer and drainage <br /> improvemenu for an amount not less than f 0%of the cost of construction and shall run for <br /> one yeaz from the date of fir.al approval/issuance of the first Occupancy PermiL <br /> 5. A two yeaz guarantee is requited for private retention/detention or other drainage <br /> treatmenUabatement facilities serving azeas lazger than one acre. <br /> 6. On-site watermain witl be staked within an easement to the Ciry. The easement will be <br /> submitted to the City prior to issuance of permiu. <br /> 7. As-builts of storm sewer, sanitary sewer, and water systems will be required to be <br /> submitted per City Design and Construction Standards and Specifications. <br /> 8. A Performance Guazantee is required for street improvements on Upper Ridge Road prior <br /> to any building permit being issued. <br /> 9. At the present time. Everett Transit does not directly serve the subject property with fixed <br /> route bus service. The nearest fised route service is at 7�lth Street and Lower Ridge Road. <br /> However, Paratransit vehicles now serve Diversified [ndustrial Services. <br /> ]0. Everett Transit is evaluating the possible extension of fixed route service to 76th Street. A <br /> bus stop and/or shelter may be appropriate at the intersection of 76th Street and the <br /> proposed access road. The project proponent should contact George Bacter(Everett <br /> Ttansit Operations �tanager, 257-8803) prior ro construction to discuss possibte future <br /> service and transit improvements (shelter/stop). The location of the bus stop srtall be <br /> approved jointly by the City and Mukilteo School District. Contact person at the school <br /> district is Steve Winecoff. <br /> l l. The City of Everett prohibits outdoor buming. Therefore, outdoor buming for the purpose <br /> of disposir.g of construction debris or rubbish will not be permitted. <br /> l2. Demolition of buildings shall be in compliance �vith the provision of Uniform Fire Code. <br /> Section 87.(O5, "Fire safery During Demolition) <br /> 13. Any rockeries or retaining walls proposed in required setback areas must be in <br /> conformance with Section 39.150 of the Zoning Code. <br /> I d. The Washington State Clean Air Act requires the use of all l:nowm, acailable, and <br /> reasonable means of controlling air pollution, including dust. Dust eenerated during <br /> construction activities can be controlled by wetting those dust sources such 3s aze3s of <br /> exposed soils, u�ashing truck wheels before they leave the site, and installing and <br /> raaintaining gravel consuuction entrances. Construction vehicle track-out is also a major <br /> dust source. Any evidence of track-ou[can tri¢ger violations and tines from the <br /> Department of Ecoloey or the Puget Sound Air Pollution Con�ro� Agency. ' <br /> � 7 <br /> � <br />