My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7821 UPPER RIDGE RD 2016-01-01 MF Import
>
Address Records
>
UPPER RIDGE RD
>
7821
>
7821 UPPER RIDGE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 8:45:15 AM
Creation date
3/8/2017 8:45:04 AM
Metadata
Fields
Template:
Address Document
Street Name
UPPER RIDGE RD
Street Number
7821
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 3 <br /> CLOSED Cii WORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 02/25/1998 Page 1 <br /> Date Range �01/09/1989 - 02/18/1998 ------------------------------------ <br /> CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196730275 <br /> Item Range :<Blank> - FTVL3694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7101196730275 Title: AFTER HOUR.i REPAIR 7821 UPPER RIDGE RD. <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: Wt�II,1284Q03 -- WATER MAIN LINE ' <br /> Location ID: -- <br /> Program 710 FLnction 119 Activity 673 <br /> Date Completed: 02/10/1998 <br /> Overall Craft: <br /> Issued: 02/10/1998 Issued by: JSM Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST AGE ALLEN, GARY E. 0.00 3.00 66.24 <br /> UL DMJ DOUCETTE, MARK J 0.00 3.00 48.60 <br /> WST JSM JEX, STERLING M. JR. 0.00 3 .00 66.66 <br /> IiEO SR SIERRA, RA,'�SON (NMI) 0.00 3.00 62.73 <br /> Total Labor Cost: 244. 23 <br /> Haterials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> CLAM46022247 CLAMP REPAIR 8" 9.00-9.40 STLS 02/09/1998 1 79.97 <br /> N/A SAND 02/09/1998 4 32.00 <br /> Total Material Cost: 1 31 A 7 <br /> Vehicles: �q <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V0042 �96 CHEV ASTRO VAN 3 .00 14.9Q <br /> V2150 87 FORD 2 TON W/CRANE 3.00 17.7U <br /> V2226 88 FORD DUMP 5 YARD 3.00 30. 50 <br /> �/H0003 94 CAT BACKHOE 3.00 74.'�0 <br /> Total Vehicle Cost: 137.40 <br /> Work Description: � <br /> -------------------------------------------------------------------------------- <br /> BEAM LOAD ON 8" CI <br /> Total cost for work order 710119673U275: 493 .60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.