Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 8/5/2009 <br /> Public Works Permit#: PW0908-007 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> zWIETT <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> JUNGE MICHAEL <br /> 401 VERALENE WAY SW <br /> EVERETT WA 98203 <br /> PHONE: 4254184082 PHONE: <br /> TAX PARCEL ID# 00708000006000 SITE ADDRESS: 401 VERALENE WY SW <br /> DESCRIPTION OF PROPOSED WORK: <br /> INSTALL FENCE NEXT TO SIDEWALK <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Fence must be placed in back of water meter box. <br /> 5. Fence must not exceed 6' in height if outside of the front setback area; 42" maximum height in front setback;. I ' <br /> Firnstahl, Planning Dept.) <br /> 7�' tl <br /> U rt 'L / 'ASS as �t-e s<- 4v 0 cvA�4- '' ;-,, <br /> Lb,1/1 AJ 6— . -fv Wirt 1& C <br /> °d �!a <br /> e'ir* er <br /> a <br /> r•J F-_ �I <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> . — ' /a� of <br /> or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> Ap roved for Construction Date public property damaged ereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applica t Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUE D THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> 1 <br />