My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9904 1ST PL W 2017-03-08
>
Address Records
>
1ST PL W
>
9904
>
9904 1ST PL W 2017-03-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 9:13:24 AM
Creation date
3/8/2017 9:13:11 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST PL W
Street Number
9904
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/23/2016 Page 1 <br /> 3:14:56PM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1211-014 Site Address 9904 1ST PL W <br /> Applied 11/19/2012 Applicant Lot <br /> Approved 12/8/2012 Owner CORNERSTONE HOMES NW LLC Block <br /> Issued 12/17/2012 Contractor CORNERSTONE HOMES NW LLC Tract <br /> Parent Permit No. Description NEW HOUSE-BASIC 429 <br /> Notes <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 12/26/2012 12/26/2012 UFER Ground DWF Approval Contractor installed <br /> UFER bar ground <br /> 12/26/2012 12/26/2012 Footing DWF Approval Approved per plans, <br /> OK for concrete <br /> 12/26/2012 12/26/2012 Foundation DWF Approval Contractor verified <br /> set-backs <br /> 12/31/2012 12/31/2012 Foundation MWH Approval <br /> 1/7/2013 1/7/2013 RoofDrain CRL Approval <br /> 1/7/2013 1/7/2013 InsulBldg MWH Corr Reqd Minimum 24"slab <br /> insulation <br /> 1/10/2013 1/10/2013 InsulBldg DWF Approval Slab insulation,see Inspected rigid roam R-10 foundations- <br /> notes approved to cover. <br /> 1/14/2013 1/14/2013 MechGrdWk/Slab DXW Approval <br /> 2/15/2013 2/15/2013 ShearNailing SMM Approval <br /> 2/26/2013 2/26/2013 PlbgRoughln DXW Approval <br /> 2/26/2013 2/26/2013 MechRoughIn DXW PartialApproval See Notes Rought In mechanical OK as noted no F/P <br /> at this inspection. <br /> 2/26/2013 2/26/2013 GasPiping DXW Corr Reqd Re-test gas pipe <br /> 3/1/2013 3/1/2013 Framing SMM Approval <br /> 3/5/2013 3/5/2013 InsulBldg DWF Approval See notes Insulation-approved to cover <br /> Note:Provide a copy of letter insulation <br /> certificate at final <br /> 3/7/2013 3/7/2013 DrywallNailing TMB Approval <br /> 4/30/2013 4/30/2013 Final Mech TMB Corr Reqd Reset gas pipe <br /> 4/30/2013 4/30/2013 Final Plbg TMB Approval <br /> 5/2/2013 5/2/2013 Final PW CRL Approval Site improvements <br /> satisfactory <br /> 5/6/2013 5/6/2013 Final Bldg DWF PartialApproval See notes Partial Approval-Subject to receiving <br /> mechanical final <br /> 5/8/2013 5/8/2013 Final Mech DXW Approval <br /> 5/8/2013 5/8/2013 GasPipeFinal DXW Approval <br /> >, 9 <br /> INSP12CRWS Y ' e <br />
The URL can be used to link to this page
Your browser does not support the video tag.