Laserfiche WebLink
. 3 <br /> / CLOSED Cli WORK ORDII2S REPORT <br /> Total Utility Maintenance Management System <br /> 02/18/1998 Page 1 <br /> Date Range :O1/09/1989 - O1/31/1998 <br /> CM Work Order Range :0810800810001 - UT2830-30-3?.2Pattern :7101096750355 <br /> Item Range :<Blank> - WVL3694L05 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> -------------- <br /> CM WORK ORDER ID: 7101096750355 Title: REPAIR 4810 - VESPER DRIVE <br /> «DUPI,ICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: SS3195Q042 -- SEWER SERVICE <br /> Location ID: -- <br /> Program 710 Function 109 Activity 675 <br /> Date Completed: O1/1Oj1998 <br /> Overall Craft: <br /> Issued: O1/13/1998 Issued by: HDA Assigned to: AGA <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planne3 Hrs Actual Hrs Cost <br /> ----------�------- ---------- ---------- ---------- <br /> ----- ------ ------------ - <br /> SUP1 AGA AHLES, GREGORY A. 0.00 2.00 46. 32 <br /> UL GDJ GOSS, DANNY JAMES 0.00 7.30 105. 92 <br /> HEO MCC MAGEE, CARL C. 0.00 8.00 169.60 <br /> HEO OH.7 O�LEARY, BRIAN J. 0.00 (i.00 112. 38 <br /> DLI QBR QUINN, DAVID R. 0.00 0.00 0.00 <br /> HEO SDD STECHER, DANIEL D. 0.00 8.00 ___ 167_28 <br /> Total Labor Cost: 601.50 <br /> liaterials: <br /> ID Description Date k Used Cost <br /> ------------ -------- -------- --------- <br /> BRIC00061156 BRICK LJNCRETE 2" X 4" X 8" O1/13/1998 2 0.54 <br /> COUP42300247 COUPLING 4" CONC X 4" Cl/PL O1/13/1998 1 2•�� <br /> ELL042303047 ELL 4" 45 DEG SP X GASKETED O1/13/1998 1 2. 24 <br /> ELL042303247 ELL 4 22 1/2 DEG SP X GASKET O1/13/1998 1 2. 37 <br /> n <br /> PIPE42304147 PIPE 4" PVC SEWER O1/13/1998 4 ______2_40 <br /> Total Material C�st: 10. 32 <br /> Vehicles: Cost <br /> ip Description Hours <br /> ------------ ------------------------------ ------ ---------- <br /> V0010 '92 GMC S10 PU 2.00 10.60 <br /> V2152 87 DODGE W/HOIST 7.30 35.04 <br /> V2663 87 VACTOR 6.00 286 .80 <br /> V3603 86 CASE BACKHOE 780 8.00 311.70 <br /> V6807 89 COMPRESSOR IR 7.30 35. 04 <br /> VJ0002 93 INTERNATIONAL 10 YD 8.00 168.00 <br /> Total Vehicle Cost: 84E 68 <br />