My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4928 VESPER DR 2016-01-01 MF Import
>
Address Records
>
VESPER DR
>
4928
>
4928 VESPER DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 9:42:08 AM
Creation date
3/8/2017 9:42:05 AM
Metadata
Fields
Template:
Address Document
Street Name
VESPER DR
Street Number
4928
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G��� -,�1�� Everett Publi� lNr�rks <br /> October 23, 2012 <br /> '- ' r ��� ��,, - . <br /> DONALD & MARLA CARTER <br /> 4708 SEAHURST AVE <br /> EVERETf, WA 98203 <br /> RE: STATUS OF YOUR CI7l' OF EVERETT PERMIT(�) <br /> Job Address: 4928 VESPER DR <br /> Permit E1104-052 REPLACE KNOB � TU6[ <br /> (Please reference both permit number and address when calling or writing) <br /> According to our records, vae do not have final approval for the pem�it(s) listed above. Sections <br /> 105.5 and R105.5 oi the Intemational Building Code and International Residential Code state <br /> that permits become invalid if the vdork is not commenced or is suspended or abandoned for <br /> more than 180 days. Work under your permits will no longer be authorized unless you: <br /> 1) Demonstrate continu�ng progress by requesting inspection of wor�c that has occurred since <br /> your last inspection, or <br /> 2) Request final inspections of the work that is completed, or <br /> 3) Submit a written request for a 180 day extension, detailing justifiable cause for extension. <br /> it is your responsibility to ensure that permitted work is properly and safely completed, an�i that <br /> all required inspections are performed. Please contact us by December 3, 2012 to <br /> schedule inspections or request extension. After that time the file will be sent to <br /> microfilm �vithout final approval. <br /> Please note that we will not be sending repeated letters if after further insper.tions the permit <br /> once again reaches expiration. If the permits are allowed to expire and you decide to go ahead <br /> with the project in the future, you must apply for and purchase new permits, meeting current <br /> Code criteria. <br /> To schedule inspections call our automated inspection line at (425': 257-8881, or to discuss the <br /> status of your project, please call our Permit Technicians at (925) 257-8810. <br /> Cih� of Everett Permit Serviccs <br /> ti:��A1\1rlruJ�I.�'ll�'r>\Lcllcrs'_Ul��c���_'Ol_'-1 U.d��c <br /> ('I�I�I' OF I:A'IiRI�TI' PURLIC \VORl:ti ;�OU Ccd;u' St. l��rr�lt. AV':� 9S�U1 (�J'>1 ��7-tiS10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.