Laserfiche WebLink
APPLICATION FOR HUILDING PERh7 T <br /> PAGE 2 <br /> . H. Provide GFI protected circuit for bathroom(s) <br /> in new addition only (at this time) . <br /> I. Provide lighting circuiL for new addition. <br /> J. Provide 20 amp wall outlet circuit(s) to <br /> new addition. <br /> III. PLUMBING <br /> 1. All pressum plumbing - 'Iype "PS" copper. <br /> 2. 7111 waste - ABS Plastic. <br /> A. Inspect and replace as mquired, incoming <br /> pressum lines to hot water heater and new <br /> addition. <br /> H. Provide new pressure and waste plumbing to <br /> washer. <br /> C. Rough in pressurn and wast� plumbing for future <br /> bathroom(s) . <br /> D. Upgrade pressure plwnbing to kitchen s:nk. <br /> NOTE; Waste for new addition will be routed to 9 inch <br /> sewer line, which in turn will be routed outside <br /> existing building to connect with existing <br /> building sewer. <br />