Laserfiche WebLink
CLOS's'D �'.M �QORIC ORD$RS RSPORT <br /> Total Utility Maintenar.ce Management System <br /> 10/29/1998 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range : 06/24%1900 - 10/28/1998 � <br /> CM Work Order Range :0810800810001 - UT2883- - Pattern :7101196751579 <br /> Item Range :<Blank> - W�IL3694L05 Pattern :* <br /> Program A. ; Function ALL Activity ALL <br /> ____________________________________________'____________-______________________ <br /> CM WORK ORPER ZD: 7101196751579 Title: RENEW 2908 VICTOR PL' <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Ztem ID: WS2095B087 -- WATER SERVICE <br /> Location ID: -- <br /> Program 710 Functioii 119 Activity 675 <br /> Date Completed: 10/09/1998 <br /> Overall Craft : <br /> Issued: 10/08/1998 Issued by: WMW Aasigned to: <br /> Out of Service? NO Priority: Travel Time: 0 . 00 Hr. <br /> Meter Reading: <br /> Downti;ne : 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL CSG CAVANAH, SHANE G. 0 .00 5 . 50 83 .82 <br /> WST LDS LOFLING, DELMAR S. 0 . 00 2 . 50 55 . 93 <br /> WST TDE1 THOMPSOh, DWAYNE E. 0 .00 8 . 00 166. 16 <br /> Total Labor Cost : 305 . 91 <br /> Materiale: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ----�------ <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITEO 10/09/1998 1 8 .39 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 10/09/1998 1 8 .48 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE� 10/09/1998 1 8 .48 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE� 10/09/1998 1 7 .81 <br /> BOX000056247 SOX METER PLA 15" X 10" W/LID 10/09/1998 1 12 . 99 <br /> COUP34004047 COUPLING 3/4" 1/8 BEND COPFERO 10/09/1998 1 6. 72 <br /> COUP34135497 COUPLING 3/4" MIP X 1/2"CTSPJ� 10/09/1998 1 4 . 04 <br /> PT_PE34060647 PIPE 3/4" POLY I . P.S. 10/09/1998 10 1 . 80 <br /> SETT34146547 SETTER COP 5/8" X 3/4" (H9") 10/09/1998 1 44 . 07 <br /> Total Material Cost : 102 .78 <br /> Vehiclea: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ----- - ---------- <br /> VJ0026 ' 97 FORU 1 TJPT SVC TRUCK 8 . 00 47. 20 <br /> ---------- <br /> Total Vehicle Cost : 47. 20 i <br /> Total cost for work order 7101196751579 : 455 .89 � <br /> t <br /> ! <br />