My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9606 19TH AVE SE PREMIER STORAGE 2021-12-14
>
Address Records
>
19TH AVE SE
>
9606
>
PREMIER STORAGE
>
9606 19TH AVE SE PREMIER STORAGE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 8:57:37 AM
Creation date
3/8/2017 11:04:47 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9606
Tenant Name
PREMIER STORAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 19, 2013 <br />ES-2432.02 <br />Earth <br />I Solutions <br />NWLLC <br />Earth Solutions NW LLC <br />• Geotechnical Engineering <br />• Construction Monitoring <br />• Environmental Sciences <br />Premier Storage Everett, LLC <br />5729 Lakeview Drive Northeast, #200 <br />Kirkland, Washington 98033 <br />Attention: Mr. Jeff Norris <br />Subject: Final Report <br />Construction Monitoring and Consulting Services <br />Premier Storage — Buildings A & B <br />9606 — 19th Avenue Southeast <br />Everett, Washington <br />Reference: Earth Solutions NW, LLC <br />Geotechnical Engineering Study <br />ES-2432, dated June 28, 2012 <br />Dear Mr. Norris: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. ESNW provided the referenced <br />geotechnical engineering study for the project. Our services included providing onsite <br />observations and testing on a full-time and part-time basis from October 8, 2012 to February <br />27, 2013. ESNW representatives made 24 site visits to observe or test shoring installation, <br />building slab and foundation subgrade, stormwater vault foundation subgrade and backfill, and <br />utility trench backfill. <br />ESNW representatives observed soldier pile and wood lagging shoring installation on a full- <br />time basis. The shoring was installed in accordance with the project plans and our <br />geotechnical recommendations. <br />ESNW representatives observed building foundation subgrade and stormwater vault foundation <br />subgrade to be dense and suitable for the design allowable soil bearing capacity of 2,500 psf. <br />Vault drainage consisted of a crushed rock base and a perimeter perforated PVC drain pipe, <br />embedded in drain rock and covered with a layer of filter fabric. <br />1805 - 136th Place N.E., Suite 201 • Bellevue:, WA 98005 • (425) 449-4704 • FAX (425) 449-4711 <br />
The URL can be used to link to this page
Your browser does not support the video tag.