Laserfiche WebLink
• EV'El. CITY COM61, 1 ®A itEM 18FT <br /> J <br /> PROJECT TITLE: <br /> Authorize a Call for X Consent COUNCIL BILL# <br /> Construction Bids for the Action Originating Department Public Works <br /> Water Pollution Control First Reading Contact Person Heather Griffin <br /> Facility North Outfall Second Reading Phone Number (425) 257-7206 <br /> Protection Structure Third Reading FOR AGENDA OF March 21, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Hea <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Smith Island Professional Services Public Works/Utilities <br /> Agreement for design <br /> services May 10, 2006 <br /> Amendment No. 1 <br /> January 31, 2007 <br /> Amount Budgeted $500,000.00 <br /> Expenditure Required $1,000.00 Account Number(s): UP 3296 <br /> Budget Remaining $428,304.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett maintains Snohomish River dikes at Smith Island to protect the Water Pollution Control <br /> Facility(WPCF). The WPCF outfall pipe penetrates the dike and discharges to the Snohomish River. <br /> Improvements to the dikes include the placement of fill on the levee embankment to meet the Army Corp of <br /> Engineers standards. A sheet pile and precast concrete outfall protection structure has been designed for the <br /> WPCF outfall to protect the 48-inch concrete pipe from the additional fill. <br /> RECOMMENDATION: <br /> Authorize a Call for Construction Bids for the Water Pollution Control Facility North Outfall Protection <br /> Structure. <br />