Laserfiche WebLink
1 <br /> � <br /> � <br /> Jnnunry �t., 197z <br /> Fir, David Valenti <br /> Z507 View Crept Drive <br /> tverett, idashiagton <br /> Re: Setrar Charge ' <br /> 25Q7 View Crest Dr1ve <br /> Cverr , aahirgicm---_. - <br /> Dear 14r. Valenti: <br /> The oever charge for t:ie sub�ect prope:�ty in as followa: <br /> $324.40 Dack Charge <br /> 30.00 Connectlon Char�e <br /> $354.4D Total Sewer Char�.e thru January 1972 <br /> The �o�Ehly sew+er charge aill be as follove: <br /> $3.75 per month conetructioa chargn <br /> 2. ?.5, per mont5 cmrer service <br /> $G.00 per month sewer uee charge <br /> This eewar wae eppzm•ed for hook-up on November 15, 1964 ao the back <br /> charge ie based upon 67 months. <br /> Yourn truly <br /> John 1L FarrenA, ,T�r, <br /> Plana iscaminer i <br /> J1iE':eb <br />