Laserfiche WebLink
Decembe. 9, 1987 <br /> Date � <br /> Valley Natural Gas <br /> 1�323 Hwy 99 <br /> Everett, WA 98204 <br /> Job Addl'e55: ?507 View Crest Ave. <br /> Permit No: 17961 <br /> Date of Pennit: 3-26-87 <br /> A review of our inspection record file reveals that the last inspection made <br /> at the subject address was on 4-23-87 All permits <br /> expire by limitation and become null and void if the building or work <br /> authorized by permit is suspended or terminated at any time after the work is <br /> commenced for a period of 180 days. The City of Everett Building Code <br /> requires final inspection ior a11 permits issued, and it is the responsibility <br /> of the pPrmit holder to call for the necessary inspections. _ <br /> IP work is continuing, please call for inspection within the next se��=n days; <br /> or- if work has been unavoidably delayed, request from us in writing an <br /> extension of your permit (permits may be extended once for an additional 180 <br /> days from date of issue). If you do not contact us within seven days you may <br /> assume your permit has expired. The Building �epartment is lccated on the <br /> second floor, Service Center 8uilding, 3200 Cedar Street; or call us at <br /> 259-8745. <br /> Your cooperation in this matter will be appreciated. <br /> Sincerely, <br /> ALFRED R. THEAL, P.E., <br /> Publi.c Works Director/City Engineer <br /> BY: L.N. Callahan <br /> Building Official <br /> LNC/rtm � <br /> 1623H <br /> 0925H for primary merge document <br /> i <br /> � <br />