My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/03/28 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/03/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 11:38:09 AM
Creation date
3/8/2017 11:37:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/28/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Competitive Preservation Grants <br /> 2007 Grant Application <br /> R <br /> c, <br /> 8. Fill out the budget on the following page. On a separate page, describe <br /> how the budget was determined and why this budget is appropriate. <br /> Complete a short narrative statement for each of the budget categories, <br /> describing what items are included within the proposal. (No more than 1 <br /> page in addition to the budget form) <br /> Consider the following items in developing the response: <br /> • The cost factors necessary to implement the proposal. <br /> • The process used to arrive at the budget including developing cost <br /> estimates or obtaining quotes from suppliers and vendors where <br /> appropriate? <br /> This question i wortF points,. will l k for: <br /> . A bund .et•that is pi a and 4te. <br /> ▪ A short narrative t tem t fore=40 f he dgl :t tegories:,.desciib ng <br /> what items are included within' a pr p® 1, ftturefigure was <br /> determined within t t,,tatoe <br /> A budget `hat is t f)r ie: ojje alt ° A a_ %go, <br /> elatf etot egftfie i s# �.: rl <br /> • Evidence of yldcal;commi'tfi it To the p`.r to;1'ottvi. local <br /> The project has 3 phases. <br /> First, the unbound Sanborn maps will be delivered to the vendor for digitizing. OCLC <br /> Preservation Services has given us their cost estimate, which is the amount we have <br /> itemized in the following budget. <br /> Second, the maps will be delivered by the vendor to a subcontractor for preservation <br /> of the originals. These will be placed in archival sleeves and post bound in two volumes. <br /> The cost estimate given below was figured by OCLC and one of their professional <br /> subcontractors. <br /> Third, the digital images will be added to our website using our CONTENTdm <br /> program. <br /> 15 <br /> 12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.