Laserfiche WebLink
I <br /> INSPECTION REPORT <br /> Date (Of( Permit: \ 9 0 G 7 <br /> a <br /> -- Contractor: 6--Nexo Q � ` I tttg <br /> �`� <br /> ��� / Owner: <br /> Site Address: ��J� l , Jt__,--54O I <br /> TYPE OF INSPECTION REQUESTED •-..--- <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In uctural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED OEllK OR C.O. ❑ VIOLATION <br /> A O E : <br /> LL(425)257-8881PERFORM FORINSPREINSPECTION—24 hour notice required <br /> /l/b PPov63 S-4'r d 1,P4 <br /> -fitia"iu 6A1 <br /> Slims - <br /> Inspector: Date: 6---/C7 /� <br /> ��p/pg) DAJABAR.INC. <br />