Laserfiche WebLink
COYVLIANCE NWEC LOWRISE RESIDENTIAL COMPLIANCE CHECKLIST <br /> RECUIpED� El�ctrlcally haetad dwNllnp�, s 3 riorles, Zone 7, Western Waihlnpton <br /> INBPECTION �MPORTANT: Pl�aia supply Inlormetlon requestad In the ahaded box below. <br /> APPROVED Dbreperd toplc� thet don't daecrlb� your bulldlnp :� equlpment. DO NOT <br /> plece cheCks In th� two Isit columnt. <br /> �OUNDATION PHASE: <br /> � p S018� Of1611t9t1011 (Chapter 6, Option III, or Chap 4 enly):Glazfng on the side oM the <br /> home must tace withln 45 degrees of due south. No more than 60°/a of ihe glazing may Iie between 31 to <br /> 45' of due South. <br /> Chooa� an A or B opflon and below yrada wall lnsu/atlon optlon: <br /> ❑ ❑ Radon Mltipatlon sleb requirements wlll 6e addressed by: <br /> ❑ A. 4"course grade qrave base urxler slab (�urtsdictlon will oHer Iree Radon monfloring oplbn) <br /> OR <br /> ❑ B. Slab won't be poured over gravel base, Dwelling will be rtwnitored for Radon when <br /> completed. (DepaAment staH will provide detailed requiremonts o(this option) <br /> ❑ � Sleb Insuletlon will be ❑ R10 (ChqB, all options)or ❑ R_(Ch#4 or5): <br /> ❑ A. Exterior slab insulation will extend downward to frostline or the slab bottom. <br /> OR <br /> ❑ B. Interior slab insulation will extend downward from the top slab suAace to Its undersuAace I <br /> and horizontally under the slab for a total distance of 24",or veAically 24". <br /> ❑ � Below prade mesonr,y weR Insulatlon will be: i <br /> ❑R10 (Ch N8, All o�tions) on the exterlor well Instead of R19 Interior Insulation. See NWEC <br /> OR FINAL PHASF REOUIREMENTS) <br /> rJ R_(Chepler 4 or 5) <br /> p ❑ Thermal break(s) wlll be placed In the slab between the conditbned and uncondflbned spaces I, <br /> checked below, and extend irom the top oi the slab to the boriom, then underneath toward the <br /> condltioned spacs tor a 24"total devebpod dimension. <br /> p dwellinglgarage ❑ dwelling/connected space ❑slab edge and foundatfon wall. <br /> ❑ ❑ Ezposed above•prade Inaulatlon protected with stucco coating,or metal or plastic tlashing. <br /> p ❑ Vepor retarder(<1 perm) required under the slab bocause course arade gravel either is not installed or <br /> Iess than 2"thick. <br /> � p Insuletion Is approved for sub-grade, exterior use and properly installed. <br /> NWEC Foundatlon phase requlrements: <br /> Approved by: <br /> Date <br /> S III OIS U9Bd: =s ueb > rester tAan <len than rsihr 1hm or s usl bn th�n or• u�l � <br /> .-,:: . .. . ........... .... ...: . ... ,.,., ,..., ... ,...... ,::,,.,: .,.�,... .� - � <br /> WEEB APNIL YO <br /> Page 3 ot 7 <br />