Laserfiche WebLink
everett INSPECTION REPORT <br />Address _5E b i <br />Contractor <br />Owner <br />Date <br />TYPE OF INSPECTION REQUESTED <br />E BLDG: Pmt. No. __�[] MECH: Pmt. No. <br />LBG: <br />❑ Pmt. No. ELEC: Pmt. No. Pin <br />❑ Temp. Elect. <br />El Framing <br />0 Drywall, Nailing <br />❑ Gas pi g <br />❑ Consultation <br />❑ Footing <br />❑ Foundation <br />p Shear Nailing <br />❑ Groundwork <br />❑ Struct. Slab <br />❑ Ductwork <br />p Grid <br />❑ Rough -in <br />final <br />❑ Wood Stove <br />I \Iln nN <br />p Service <br />APPROVAL ❑PARTIAL APPROVAL <br />OL ❑CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact Inspector and arrange for appointment. <br />G was not able to perform inspection. <br />[I CAL 259-8810 FOR REINSPECTIONA CERTIFICATE — 24 hour notice required. <br />F OCCUPANCY <br />CU HALL BE ISSUED AND POSTED ON <br />THE PREMISES <br />Dale L=—= <br />inspector <br />