Laserfiche WebLink
APPbcation For <br />4a7r PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 259-BB10 <br />TO PASTING `gip' v'997 <br />TYPE OR PRINT ONLY <br />-- <br />Date <br />6-4-97 <br />Public Works Permit if I.5— <br />Building Permit A _ 55344 <br />Public Works Fee S <br />Robert Lindsay 1906 Virginia Ave Everett 98201 <br />Owner Mailing Address City Zip Phone <br />Pacific Garages Ed Olson 259-1311 <br />Applicant Mailing Address City Zip Phone ^� <br />Describe Proposed Work <br />detached <br />PROJECT ADDRESS (if known) 1906 Virginia Ave <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following if applicable: <br />•Property Lines •Outline and dimensions of all existing and proposed structures on the lot •Existing and proposed utilities <br />-Centerline of street "Indicate North *Show any proposed grading changes *Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. <br />Date <br />Approved as Constructed <br />l <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of instailation and maintenance of <br />the improvement or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />