My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 VIRGINIA AVE 2016-01-01 MF Import
>
Address Records
>
VIRGINIA AVE
>
2026
>
2026 VIRGINIA AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 10:22:27 AM
Creation date
3/8/2017 12:17:28 PM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2026
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />( 7.) Connect all rooftop downspouts to the side sewer. <br />u <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to dis��uss potential drainage <br />routing prior to beginning the project. <br />1 t. Install erosion control measures as determined by the Publir, Works inspector, such as siit <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Star.dards for small parcels <br />� Remove erosion control measures upon completion ot the project prior to final approval of the <br />permit. <br />14. All excavated materiai irom foundation, sidewalk a��d driveways shall be hauied to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />��� <br />� 15..Remove and replace curb, gutter and sidewalk as per City of EvereY Standard Plan #'s 305A <br />"& 306 on this proposal's frontage as directed hy the Public Works Inspector (i.e. all unuse <br />driveways_and any broken or da�agE.�aceam���t 6a r.___ta�o�+,�, <br />16. install a Type I concrete driveway per City of Everett Standard #307, <br />17. Pave driveway from the frent property line out to the street paving. <br />18. Contact the Water District for conner,ting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Ptan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow ac,oss the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />Plvcammen�s " � � \ <br />?O � [n V i rJiiliCz � <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.