Laserfiche WebLink
��M <br />ay <br />,oxx <br />�„" H <br />bHV� <br />ti <br />/C�C� <br />H �7 <br />'��.7 H'il <br />VJ H <br />H <br />�x <br />HC7 <br />OH <br />H�g <br />�y � <br />rHH <br />g� <br />H <br />oe7cn <br />��� <br />zy�n <br />H O f/� <br />I �� <br />i �r <br />� ,�� <br />COMPLIANCE <br />REOUIHED _� <br />_� <br />NWEC LOWRISE RESIDENTIAL COMPI.IANCE CHECKLIST <br />Electrlcally heated dweliings,s 3 storles, Zone t, Western Weahlnpton �'=;" <br />IN9PECTION IMPORTANT: Piease supply Informetlon reques�.ed In the shaded box below. <br />npppoveo Dlareperd topics that don't descrlbe your bullding or equipment. �p NOT <br />place checks In the two lelt coiumns. <br />FOUNDATION PHASE: <br />p p Solar orientation (cnapter s, Option III, or Chap 4 only): Gia: ing on the side on tne <br />home must tace within 45 degrees of dua south. No more than 60°/a ol the glazing may lie belween 31 to <br />45' ol due South. _ _ -. <br />❑ ❑ <br />❑ ❑ <br />❑ ❑ <br />❑ ❑ <br />Choo� r 8 opNon and below yrade well Insu/atlon opNon: <br />Radon Mltlgation slab requirements will be addressed by: <br />❑ A. 4" course grade grave base under slab (Jurlsdiction wili ofler Iree Radon monitoring option) <br />OR <br />❑ B. Slab won't be poured over gravel base, Dweiling will be mon8ored lor Radon when <br />completed. (Department stafi will provide delailed requirements ot lhis oplion) <br />Siab Insulatlon will be ❑ R70 (Ch�6, all options) or ❑ R_(Ch#4 or5): <br />❑ A. Exterior slab insulation will e�Aend downward la froslline or ihe sla6 boltom. <br />OR <br />❑ B. Interior slab Insulation will extend downward irom the top slab surface to Its undersurface <br />and horizontally under the slab for a total distance of 24", or vertically 24'. <br />Below greda mesonry well Insulatlon will be: <br />❑ R10 (Ch #6, All options) on the exterior wall Instead of F�INAL PHASE RE�UIREMENT ) <br />OR <br />❑ R_(Chapler 4 or 5j <br />Thermal break(s) wlll be placed in the slab he6veen the condiUoned and unconditloned spaces <br />checked below, and extend irom �he top of the slab to the botlom, then undernealh toward Ihe <br />conditloned space for a 24" total developed dimension. <br />❑ dwelling/garage ❑ dwelling/connecled space ❑ slab edge and toundation wall. <br />Exposed above•grede Insulatlon prolectedwithstuccocoating,ormetalorplastic flashing. <br />Vepor retarder(<1 perm) required under the slab because course grade gravel either is not installed or <br />less than 2" thick. <br />Insulation Is approved lor sub•grade, exterior use and properly installed. <br />NWEC Foundatlon phase requlrements: <br />Approved by: <br />Date <br />WEE9 �PNIL 00 <br />Paga 3 of 7 <br />