Laserfiche WebLink
CLOSED CMNOR1C ORDERS REPORT TO POSTING N N 3 0 2M <br />Totai Utility Maintenance Management System <br />07/22/1998 Page 1 <br />Date Range :01/09/1989 - 06/30/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196649664 <br />Item Range :<Blank> - VIVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196649664 Title: SO 75 INCH 4915 VISTA PL <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 06/16/1998 <br />Overall Craft: <br />Issued: 03/10/1998 Issued by: Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labort <br />Craft ID <br />UL CSG <br />WST TDE1 <br />Materialat <br />ID <br />ADAP34000547 <br />ADAP34145347 <br />BOX000065547 <br />CORP34001847 <br />COUP34003947 <br />METE36089447 <br />N/A <br />PIPE34060647 <br />SADD44016847 <br />SETT34033647 <br />vehicles: <br />ID <br />------------ <br />VH0003 <br />VJ0026 <br />Name <br />--------------- -------- <br />CAVANAH, SHANE G. <br />THOMPSON, DWAYNE E. <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITEQ <br />ADAPTER 3/4"MIP X 1"IPS INSTAQ <br />BOX METER CONC W/STEEL LID <br />CORP STOP 3/4" CCT X INSTA <br />COUPLING 3/4" 1/4 BEND COPPER® <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TRACING WIRE <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />------------------------------ <br />94 CAT BACKHOE <br />197 FORD 1 TON SVC TRUCK <br />Planned hrs Actual Hrs Cost <br />0.00 6.00 87.06 <br />0.00 6.00 1.23.72 <br />Total Labor Cost: 210.78 <br />Date <br /># Used <br />Cost <br />-------- <br />06/16/1998 <br />-------- <br />1 <br />---------- <br />8.41 <br />06/16/1998 <br />1 <br />10.67 <br />06/16/1998 <br />1 <br />47.91 <br />06/16/1998 <br />i <br />15.32 <br />06/16/1998 <br />1 <br />7.53 <br />06/16/1998 <br />1 <br />30.67 <br />06/16/1998 <br />14 <br />1.54 <br />06/16/1998 <br />lad <br />2.16 <br />06/16/1998 <br />1 <br />12.04 <br />06/16/1998 <br />1 <br />52.81 <br />Total Material Cost: <br />Hours <br />0 <br />Total Vehicle Cost: <br />Cost <br />149.40 <br />35.40 <br />184.80 <br />189.0 <br />1A _ <br />1% 7 •S? <br />Work Description: <br />-------------------------------------------------------------------------------- <br />