Laserfiche WebLink
r L/TY OF EYEFRETT <br />B1111,51NG D/i//S/ON <br />3200 CEDAR SrEYERETT, WA 9820! (205) 259-BB/O E77 <br />About this form: This form isn't as involved as It looks, because you only use portions of it for a particular <br />dwelling project. Instead of spending time your <br />project. <br />through the WSEC, it is also an excellent this <br />ool for learning the residenze tial <br />condense condense the requirements that apply to your p j <br />WSEC requirements. <br />Requirements are grouped by foundation, framing, insulation, and final inspection phases. This not only <br />lets you know what you need to do but also when the Inspector <br />will be checking for particular <br />requirements. Use the form to choose compliance options that best suit the economics and design of your <br />" project. <br />A designated department energy specialist can helpyouWith your questions. This form will help you <br />comply with the WSEC as quickly and painlessly as possible. <br />2 Responsibility for Information: Although staff members will help you with general questions about <br />completing this form, it is ultimately your responsibility to provide detailed information about heating <br />systems, glazing, insulation, and other building specifications. Be sure to ge' prior approval from the <br />Department If you later wish to make changes in your project. For more requirement detail, refer to the <br />Washington State Energy Code, 1991 Edition. <br />3 page 1, Compliance options: Select one compliance option at the top of the table. <br />4 Pages 2 through 6, In the sh^dad box areas only.: Provide information and check circles that apply to <br />your specific project. no no in the two left side columns labeled "COMPLIANCE REQUIRED" <br />and "INSPECTION APPROVED' or in boxes located in non shaded areas (These are for department use). <br />Since this form will be evaluated for completeness and accuracy, you can avoid unecessary permit delays <br />by carefully providing all required information. You may disregard items that don't address your particular <br />building or equipment. <br />5 Compliance responsibility: This form will ultimately be used for all WSEC field Inspections. When It Is <br />returned with your permit, relevant boxes under the "COMPLIANCE REQUIRED" column will have been <br />checked by the Building Department. This denotes which WSEC requirements apply to your project. The <br />Inspector will inspect your dwelling against these checked items and, when deemed acceptable, place a <br />second check in the "INSPECTION APPROVED" column. <br />All Residential Occupancies <br />OTHER heat source (Gas, oil, propane, wood, heat pumps) <br />