Laserfiche WebLink
Date �'-4W I Pub$ _ WorFa Permit p <br />r Bld9. pert • it �n �� Sr/ <br />Application For 7T —Jr <br />PUBLIC WORKS PERMIT Public W <br />is Feork.Fe ee — <br />$ <br />Less April. Fee Paid $ — <br />BalencaDue $ _ <br />Print or Type Only <br />RQ,� Il n L r-i 6 0 9 r,....t <br />Owner Mailing Address City Zip Phone <br />7L <br />Mailing <br />Describe Proposed Work <br />Zip <br />Project Address (if known) <br />Attach four (4) copies of plans lot proposed work - Draw to scale and note the following as applicable: <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />• Centerline of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDITIONS <br />I. All calls for inspection shall be made 24 hrs. in advance - phone 259.8815. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 his. before you dig. TOLL FREE NUMBER 1 .800.424.5555. <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />i <br />PUBLIC WORKS DEPARTMENT <br />Over Cedar Street <br />Everett, WA 98201 <br />Phone: 259-8815 <br />//-//7-9(0 <br />(?/fz- " <br />ACKNOWLEDGEMENT OF CONDITIONS <br />1 a_' k_ <br />W <br />1- <br />z <br />0 <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signs ure of Applicant <br />at <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />