E <br />Plan Check No. 1328 <br />Byron Backstrom <br />August 24, 1983 <br />Page Eleven <br />L <br />lateral forces. This includes all walls not assumed to be participating(for ex- <br />ample: 7/S3.4 and 15/S3.6, and the stubby columns with the deep wall spandrels <br />shown on Sheet S3.2 and S3.1) Section 2312(j)D <br />22. The footing across the 12'0" door opening along Grid Line D should be designed <br />as a continuous footing across the opening with steel reinforcement located on the <br />top and bottom, parallel to the wall. Sheet S2.1 <br />23. The width of the footing along Grid Line 14 should be specified. <br />24. The earth active pressure should be considered in imposing additional lateral <br />loads to the shear walls. <br />25. Shear wall lintel designs assumes shear defonm tion only in the distribution <br />of the vertical sheer. In shear walls 8/S3.4 and 14/S3.5 bending deformation may <br />be significant. Further, it would seem that the vertical shear through a lintel <br />should depend on the magnitude of the shear at the level of the lintel, and not an <br />average of the total shear through the whole wall. <br />26. In conjunction with Comment 25 above, the outer solid walls may begin to act <br />as individual walls depending on the flexibility of the lintels. Flexural chord <br />steel may be necesc3ry along Grid Lines C and B. <br />27. The concrete topping of the slab and connections to the walls at the second <br />level between Grid Line 2 and Grid Line 1 should be reviewed for adequacy to trans- <br />fer 732 Kips from Grid Line 2 to Grid Line 1. See calculation Sheet Wllc. <br />28. Design and connection details of the C12 x 20.7 cooling tower support beam and <br />cooling tower anchorage should be prov;ded. Sheet S2.7 <br />29. Openings in the floor girders should be detailed with stirrups in both top and <br />bottom elements. The top stirrups should be tied as required for columns. The <br />analysis should include the ;noment from the 3' span of the upper portion. See <br />Calculation Sheet B-24 <br />30. An analysis should be provided which considers the effects of dif - rential <br />settlement in the order of 112" ss indicated in the soil report p. 4 of Shannon & <br />Wilson. <br />An invoice for plan checking services rendered based on the proper valuation will <br />be forwarded to you under separate cover (when you have determined the correct <br />value), Note that a recheck is included in this fee. <br />I am retaining all data and plans in anticipation of telephone calls from the <br />architect and also that I will be doing the recheck. Please instruct the archi- <br />tect to indicate on a separate sheet on which sheet or detail the correction may <br />be found. Please notify me if you wish to do the recheck so that I may return the <br />plans. <br />