Laserfiche WebLink
International Conference of Building Officials <br />REGIONAL OFFICE: 17544 MIDVALE AVENUE N., SUITE 304 • SEATTLE, WASHINGTON 98133 <br />(206)542-9421 <br />OFFICES OF <br />BOARD OF DIRECTORS JERRY J. BARBERA. RE. <br />REGIONAL MANAGER <br />PRESIDENT S. <br />JACK S. ATKINS. P.E. FRANKO ALENGINEE P.E. <br />BUILDING OFFICIAL REGIONAL ENGINEER <br />DEVELOPMENT SERVICES DIRECTOR December 15, 1983 <br />PLACERVILLE. CALIFORNIA <br />FIRST VICE-PRESIDENT <br />JOHN E. MAULDING. P.E. <br />BUILDING OFFICIAL <br />LANCASTER. CALIFORNIA <br />Larry Callahan <br />SECOND VICE-P.BASS <br />Building Director <br />TT.RE. <br />DAVID A. BASSETT. P.E. <br />BUILDING SAFETY DIRECTOR <br />3002 Wetmore <br />MEDFORD. OREGON <br />Everett, WA 98201 <br />IMMEDIATE P1 ST PRESIDENT <br />H. T. "TED" WIEDENMAN. P.E. <br />DIRECTOR <br />Plan Check 1328 <br />DEPARTMENT OF BUILDING <br />DES MOINES.IOWA <br />Project: Snohomish County Detention Center <br />CHARLES CLAWSON Dear Mr. Callahan: <br />DIRECTOR OF COMMUNITY <br />DEVELOPMENT <br />ARLINGTON, TEXAS I would like to apologize for our mistake in addressing our <br />COLJ. JACOP.E. <br />DIRECTOR Ooriginal letter under Plan Check 1328 to Mr. Backstrom when <br />INSPECTIONS 9 <br />MINNEAPOLIS, MINNESOT+ in fact we should have addressed it to you. <br />WILLIAM J. JUSTEN, P.E. <br />DEPARTMENTIRECTOR OF CONSTRUCTION I have enclosed a Copy of our original letter that we sent Mr. <br />AND LAND USE <br />SEATTE WASH INGTON Backstrom by mistake that should have been mailed to you and <br />DONALD T. MAeR WE. P.E. a copy of the replies by the architect and engineer to my <br />STATE BUILDING COMMISSIO14ER comments. The following is my response to those comments in <br />STATE OF INDIANA <br />ADMINISTRATIVE BULDNG COUNCIL the order that was presented in the original letter. <br />NDIANAPOLIS. INDIANA <br />MICHAEL J. NOLTE <br />SITE AND GENERAL COMMENTS <br />SUPERNTENDE NT OF BUILDING <br />INSPECTION <br />EUGENE. OREGON <br />1-4. OK <br />1� <br />MARK R. RODMAN <br />DIRECTOR <br />BUILDING SERVICES <br />5. The mechanical plans were not included in the plan check <br />SPRNGFIELD, ILLNOIS <br />set of plans. <br />WI E. ST <br />MANAGER BUILDING, PLANNING <br />AND ZONNG DIVISION <br />HANDICAPPED COMMENTS <br />VANCOUVER, WASHNGTON <br />DAWD R. SCOTT, P.E. <br />DINT011 <br />1-7. OK <br />DEPARTMENT CF UIIONG <br />SAFETY <br />TEMPE, ARIZONA <br />OCCUPANCY AND CONSTRUCTION COMMENTS <br />1 PONALD R.TPEMBLAY <br />CHIEF BUILDING AND <br />ZONING INSPECTOR „/ <br />1. Materials with flame spread rating of 26-75 would not be <br />SALNA, KANSAS <br />considered as noncombustible. <br />CHARLES W. VOLZ. A.I.A. <br />CHIEP BUILDING OFFICIAL <br />DIVISION OF CODE ADMINISTRATION <br />2A 3. The mechanical plans were not included in the plan check <br />ALBUQUERQUE. NEW MEXICO <br />set of plans. <br />STANLEY WHEELER <br />CHIEF BUILDING INSPECTOR <br />LIVERMORE, CALIFORNIA <br />4. OK <br />EUGENE J. ZELLER, P.E. <br />SUPERINTENDENT. BUILDING <br />AND SAFETY <br />LONG BEACH. CALIFORNIA <br />EXECUTIVE DIRECTOR <br />JAMESE.BIHR,RE. Main Office: 5360 South Workman Mill Road • Whittler, California90601 • (,13)699.0541 <br />