Laserfiche WebLink
International <br />BOARD OF DIRECTORS <br />PRESIDENT <br />JACK S. ATKINS. P.E. <br />BUILDING OFFICIAL <br />DEVELOPMENT SERVICES DIRECTOR <br />PLACERVILLE. CALIFOW'IA <br />FIRST VICE-PRESIDENT <br />JOHN E. MAULDNG, P.E. <br />BUILDING OFFICIAL <br />LANCASTER. CALIFORNIA <br />SECOND VICE PRESIDENT <br />DAVID A. BASSETT. P.E. <br />BUILDING SAFETY DIPECTOR <br />MEDFORO.OREGON <br />IMMEDIATE PAST PRESIDENT <br />H. T. "TED" WIEDENMAY, P.E. <br />DIRECTOR <br />DEPARTMENT OF BUILDNG <br />DES MONES. IOWA <br />CHARLES CLAWSON <br />DIRECTOR OF COMMUN'TY <br />DEVELOPMENT <br />ARLINGTON, TEXAS <br />SOL J. JACOBS. P.E. <br />DIRECTOR OF INSPECTIONS <br />MINNEAPOLIS, MINNESOTA <br />WILLIAM J. JUSTEN. P.E. <br />DIRECTOR <br />DEPARTMENT OF CONSTRUCTION <br />AND LAND USE <br />SEATTLE, WASHINGTON <br />DONALD T. MACRAE, P.E. <br />STATE BUILDNG COMMISSIONER <br />STATE OF NDIANA <br />ADMNISTFATIVE BUILDING COUNCIL <br />INDIANAPOLIS. INDIANA <br />MICHAEL J. NOLTE <br />SUPERINTENDENT OF BUILDING <br />INSPECTION <br />EUGENE, OREGON <br />J= �j <br />Conferer- <br />REGIONALOFFICE: 17544 MIDVALE <br />February 3, 1984 <br />Larry Callahan <br />Building Director <br />City Hall <br />3002 Wetmorr- <br />Everett, WA 98201 <br />e'of Building Officials <br />N., SUITE 304 • SEATTLE, WASHINGTON 98133 <br />Plan Check 1328 <br />Project: Snohomish County Detention Center <br />Dear Mr. Callahan: —� <br />OFFICES OF <br />JERRY J. BARBERA. P.E. <br />REGIONAL MANAGER <br />FRANK S. NATSUHARA, P.E. <br />REGIONAL ENGINEER <br />I have reviewed the calculations and sketches that were submitted <br />to me January 25, 1984 at the meeting with you, Mr. Budden, and <br />Mr. Frits of your office and Mr. Tim White and Mr. John Plimley <br />of IIWMFL-P.S.11 Architects and Engineers. The calculations ad- <br />dressed Structural Continents No. 13, 14, 17, 19 and 25 of my <br />original letter to Mr. Byron Backstrom dated Ausgust 24, 1983. <br />I am satisfied with the submitted calculations except for a <br />point in design concept in connection with Comment No. 17(c) <br />and 17(d), which includes the combined load design of footings <br />under the shear walls located at the elevators between Grid <br />Lines 6 through 9. <br />MARKDIRECTORAN I believe that all participating elements of the foundation <br />BUILDING SERVICES system should be included in the design for forces frum the <br />BBU;UDINNGFSE VICES5 Y 9 <br />WILLIAM E. SCHLECHT west or from the east. An omission of all element in one dir- <br />MANAGER,BUILDING. PLANNING ection because it is not necessary for stability 1n that direc- <br />AND ZONING DIVISION <br />VANCOUVER. WASHINGTON tion should not be allowed unless it is shown to withstand <br />DAVIDR.SCOTT.P.E. safely the induced loads due to the resulting deformation. If <br />DIRECTOR it cannot and fails, the element would not be available to sus - <br />DEPARTMENT OF tain the load in the other direction where it is a necessary <br />TEMPE. ARIZONA element for the stability of the system. The design omits <br />RONALD R. TREMBLAY Columns 6B and 9B for forces west to east. And Columns 6C and <br />CHIEF BUILDING AND <br />ZONING INSPECTOR 9C for forces east to west. <br />SALNA. KANSAS <br />CHARLES W. VOLZ. A.I.A. <br />CHIEF BUILDING OFFICIAL In a phone conversation with John Plimley of WMFL on February <br />DIVIS ON OF CODE ICALBUQU RQUE NEW MEXICO MVIISTRATION 3, 1984, he has stated that the design will be adjusted to com- <br />STANLEY WHEELER ply. I will gladly review their design oil this matter as well <br />CHIEF BUILDING INSPECTOR as the other items where compliance was declared but no design <br />LIVERMORE. CALIFORNIA or details were provided, when they are submitted to you. Mr. <br />EERINEJ. NENT. BUILDING <br />Plimley indicated that changes will be processed properly <br />SUPERINTENDENT. BUILDING Y 9 P P P Y <br />AND SAFETY through their client thence to you; not through ICBO. <br />LONG BEACH. CALIFORNIA <br />EXECUTIVE DIRECTOR <br />JAMESE.BIHR.RE. Main Office: 5360 South Workman Mill Road • Whittier, California90601 • (213)699.0541 <br />