Laserfiche WebLink
MW Consulting Eagineers <br />January 16, 1991 <br />Mr. Tim Tyler <br />City of Everett <br />Building Department <br />3200 Cedar Street <br />Everett, Wa. 9B201 <br />Re: Snohomish County Detention Facilities Remodel <br />MW #9052 <br />Dear Tim, <br />We are following up on our telephone conversation today on the subject <br />project. <br />This project consists of some relatively mina' interior remodeling of <br />the existing county Jail and does not involve the addition of any new <br />circuits or service equipment. <br />The project consists of the construction of some ner: walls to create <br />additional beds and minor electrical modifications required to <br />accommodate these changes. <br />It is our understanding that the electrical plans will not need to be <br />reviewed by the State Department of Labor and Industries. <br />We appreciate your assistance on this project. <br />I have informed the electrical contractor of this also. <br />�i erel j <br />I ! ry <br />even D. Hill <br />cc: WMFL - Gordon Ruehl <br />Electrical Energy Construction, Inc. - Loren Dorral ' <br />�1V James W. Moore. PE <br />} V Robert H. Welt, PE <br />Paulsen Center, Suite 460 9052-1 .LTR <br />West 421 Riverside Avenue, Spokane, WA 99201.0403 <br />Telephone: 509 638.9020 FAX: 509.838.1123 <br />