Laserfiche WebLink
June 21, 1999 <br />Rob Pennell <br />MW Consulting Engineers <br />North 222 Wall, Suite 200 <br />Spokane WA 99201 <br />SUBJECT: Electrical Plan Review — Booking/Auto Sallyport <br />Dear Mr. Pennell: <br />Please provide two cop; -s each of the following items to assist in the review of the <br />Booking/Auto Sallyport project at the Snohomish County jail: <br />A complete one -line diagram <br />Existing and new panel schedules and load calculations for all panels affected by the <br />project. <br />Document PUD maximum demand figures used in the calculations. <br />Additionally, please revise the service conductor size to provide 1600 amps of ampacity <br />as required for the proposed service. <br />If you have questions, please call me at (425) 257-8810. <br />Thanks! <br />Sincerely, <br />aim CJ V <br />Tim Alaniz <br />Electrical Inspector <br />TA:jt:pcnncI1 <br />CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />