Laserfiche WebLink
* MW Consulting Engineers <br />Mr. Tim Alaniz 19 August 1999 <br />City of Everett, Everett Public Works <br />3200 Cedar Street <br />Everett WA 98201 <br />Project: Snohomish County Corrections Project Number 98611 <br />Re: Electrical Plan Review - Booking/Auto <br />Sallyport <br />Dear Tim, <br />Per your request, we are forwarding a revised drawing E4.1 which shows the complete one -line diagram for <br />this building. This revised drawing shows the service at a 1600 amp capacity which was given to the <br />contractor in the last addendum. <br />Additionally, attached are existing and new panel schedules for all panels and load calculations for all <br />panels that were modified by this project. <br />We have been working with Ed Kelso, Snohomish County PUD to try and document the PUD maximum <br />demand figures used in the calculations. Per our telephone conversation with Ed Kelso, he will contact you <br />directly to demonstrate the maximum demand figures. <br />Should you have any further questions, please call. <br />Sincerely, <br />/* C <br />Robert C. Pennell, P.E. <br />99611-06.Nr.wpd <br />Norffi 222 W311 Street, Suito 200, Spokane. WA 99201.0913 James <br />S . Moore, <br />re, E, Robert H. Welt. PE <br />Telephone: 509,838.9020 Fax: 509.838.1123 Janet <br />E. Kuhta, PE, James T. Schmitz, PE <br />A Prolession3l Limited Liability Company l <br />