My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1611 WALNUT ST 2018-01-02 MF Import
>
Address Records
>
WALNUT ST
>
1611
>
1611 WALNUT ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 11:50:32 AM
Creation date
3/8/2017 1:40:26 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
1611
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />Date gIZ-jIC`C, Permit T�,GEcc-i -CA-7 <br />eLrr Contractor: <br />Owner: A \/ % N <br />Site Address: --I_(i(li_--W.Aktti%U-1 - - - - <br />ELECTRICAL <br />❑ Tomp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Root drains <br />OTHER <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑UFER ground <br />❑Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ Framing <br />❑ Roohop Units <br />❑ Insulation <br />❑ Mechanical Final <br />PLUMBING <br />❑ Groundwoi WSlab <br />❑ Rough In <br />[:]Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />J Plumbing Final <br />GAS PIPE <br />❑ Rough IndServico Hot Water Tank <br />❑ Refrigeration ❑ Rough in <br />❑ Gas Pipe Final ❑ HWT Final <br />❑ APPROVAL - ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />gfC.ALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Root Nailing <br />❑ veiling Grid <br />❑ Building Final <br />InapoetovG,�5! _ ✓ Date: z4/ 0 <br />CIR IId08 /// nATARAn, ItB; <br />
The URL can be used to link to this page
Your browser does not support the video tag.