My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1724 WALNUT ST 2018-01-02 MF Import
>
Address Records
>
WALNUT ST
>
1724
>
1724 WALNUT ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2022 7:42:50 AM
Creation date
3/8/2017 1:46:55 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
1724
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 2 <br />10/10/2012 14:56 <br />Issued By SJT2 SPOONER. JAMES T. <br />Issued DepartmentPW PUBLIC WORKS <br />Date Issued 91612012 <br />Fund 401 Accounts Program Function Activity <br />Program UT3473 2 3 <br />Title CONVERT .75 INCH 1724 WALNUT ST UT3473-2-3 <br />Work Order Nu 20121935 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 9/512012 Time 0605 Original WO Billing_ <br />Problem Details <br />CONVERT .751NCH CURBSTOP TO.75 INCH SETTER WIMETER AND <br />BOX. FLAT TO METER PROJECT. Com I Date Comments <br />Structure ID StrTyp Activity—p- <br />WS1795Y116 WASRVC YES 9/17/2012 <br />Address 1724 WALNUT ST <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 1724 WALNUT ST <br />Location <br />Vehicle Costs <br />Type Vehicle No Description Hours <br />V J0113 2012 FORD 02 3 YARD DUMP TRUC 1.6 <br />V JO114 2012 FORD F550 1.5 TON 4X2 GAS 1.6 <br />V H0050 2013 VACTOR/INTERNATIONAL 1.6 <br />Total Vehicle Cost <br />Personnel Costs <br />Type ID Name Hours <br />Cost Billing Date Billing Code Warehouse <br />26.736 0911712012 <br />15.68 09/17/2012 <br />102.288 09117/2012 <br />$144.71 <br />Cost Billing Date Earning Code Class <br />P BGM2 BEUKERS, GEORGE M. 1.6 46.28 0911712012 <br />P FBL FISHER, BOBBY L. 1.6 36.23 09/17/2012 <br />P HLJ HUSBY, LANCE J. 1.6 41.995 09/17/2012 <br />Total Personnel Cost $124.51 <br />Total Cost 5269.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.