Laserfiche WebLink
Work Activity Work Order <br />Issued By <br />SJT2 <br />SPOONER, JAMES T. <br />Issued DepartmentPw <br />PUBLIC WORKS <br />Date Issued <br />9/6/2012 <br />Fund <br />401 <br />Accounts Program <br />Program <br />UT3473 2 <br />3 <br />Title <br />CONVERT .75 <br />INCH 1802 WALNUT ST UT3473.2-3 <br />Work Order No <br />20121938 <br />Project <br />Status <br />9/6/2012 <br />Time o6:11 Original WO <br />Function <br />Page 2 <br />10/10/2012 15:00 <br />Activity <br />Activity Type CORRECTIVE MAINTENANCE Status CL <br />Billing — — -- — -- — -- <br />Problem Details <br />CONVERT .75 INCH CURBSTOP TO.75 INCH SETTER WIMETER AND <br />BOX. FLAT TO METER PROJECT. <br />Structure ID StrTyp Activity ComDl Date <br />WS1795YI19 WASRVC YES 9/17/2012 <br />Address 1802 WALNUT ST <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 1802 WALNUT ST <br />Location <br />Type Vehicle No Description <br />Vehicle Costs <br />Hours <br />Comments <br />Cost Billing Date Billing Code Warehouse <br />V J0113 2012 FORD 02 3 YARD DUMP TRUC 1.6 26.736 09117/2012 <br />V J0114 2012 FORD F550 1.5 TON 02 GAS 16 15.68 091172012 <br />V H0050 2013 VACTOR/INTERNATIONAL 1.6 102.288 09/17/2012 <br />Type ID <br />P BGM2 <br />P FBL <br />P HLJ <br />Name <br />Total vehicie Cost $144.71 <br />Personnel Costs <br />Hours Cost Billing Date Earning Code Class <br />BEUKERS, GEORGE M. 1.6 46.28 09/172012 <br />FISHER, BOBBY L. 1.6 36.23 09/172012 <br />HUSBY, LANCE J. 1.6 41.995 09/172012 <br />Total: Personnel Cost $124.51 <br />Total Cost $269.22 <br />