My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1909 WALNUT ST 2018-01-02 MF Import
>
Address Records
>
WALNUT ST
>
1909
>
1909 WALNUT ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 2:06:39 PM
Creation date
3/8/2017 1:55:12 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
1909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ohcavon For <br />PUBLIC SvORKS PERMIT Date <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett. WA 98201 259-8810 <br />TYPE OR PRINT ONLY <br />Rob Moroso 1909 Walnut St Everett 98201 259-3475 <br />Owne Mailing Address City <br />Town 6 Country Jess Harris 743-1555 <br />Applicant Mailing Address City <br />Describe Proposed Work detached garage <br />PROJECT ADDRESS (if known) 1909 Walnut St <br />7-9-97 <br />Public Works Permit 1t <br />Building Permit N 55877 _ <br />Public Works Fee E <br />LA) <br />rP C k 1''t- <br />r <br />INITIAL INSPECTION <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following if applicable: <br />•Property Lines •Outline and dimensions of all existing and proposed structures on the lot • DATE <br />-Centerline of street •Indicate North 'Show any proposed grading changes 'Show n <br />PAUL McKEE <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-SM. <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Construc'ed <br />d <br />z <br />0 <br />O <br />a <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of <br />the improvement or other right-of-way use hereto applied for and further agrees <br />to remove ame upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORN ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.