My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2125 WALNUT ST 2016-01-01 MF Import
>
Address Records
>
WALNUT ST
>
2125
>
2125 WALNUT ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 12:52:59 PM
Creation date
3/8/2017 2:02:59 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6�ue.,� �,00c,o� <br />cr.os� c�[ t�oxR oxn�s x�ozrr <br />Total Utility liaintenance Management System <br />08/05/1996 Page 1 <br />Date Range :01/09/1989 - 08/05/1996 � � <br />CM Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101096750226 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />Q! WORK ORDER ID 7101096750226 Title REPAIR � <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: SS2095H012 -- SEWER SERVICE <br />Location ID: -- <br />Proqram 710 Function 109 <br />Date Completed: 07/22/1996 <br />Overall Craft: <br />Issued: 07/11/1996 <br />out of Service? NO <br />Meter Readinq: <br />Downtime: 0 hours <br />status: HN <br />Labor: <br />Craft ID Name <br />SUP1 <br />[JI, <br />DL <br />DL <br />HEO <br />HEO <br />HEO <br />SUP1 <br />?,GA <br />GDJ <br />HJT <br />ICKii <br />MCC <br />OBJ <br />SDD <br />WI.It <br />llaterials: <br />ID <br />ELL042303047 <br />ELL042303147 <br />N/A <br />N/?, <br />N/A <br />N/A <br />N/A <br />PIPE42304147 <br />PLUG42307647 <br />WYE042301847 <br />Vehicles: <br />ID <br />2125 WALNUT STiiiB!' <br />ACtiVity 675 <br />Issued by: NDA Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />?,HLES, GREGORY A. <br />GOSS, DANNY JAMES <br />HOUSTON, JOSHUA T. <br />KARELS, KEVIN MICHAEL LYNN <br />M?.GEE, C.�,RL C. <br />O'LE.iRY, BRIAN J. <br />STECHER, D.�,NIEL D. <br />WARNER, I.ARRY K. <br />Description <br />ELL 4° 45 DEG <br />ELL 4^ 22 1/2 <br />TOP COARSE <br />C.D.F. <br />TOP COARSE <br />TOP COARST. <br />TOP COAR�E <br />SP X GASKETED <br />DEG ?,LL GASKETED <br />(WILDER) <br />(ASSOC) <br />(ASSOC) <br />(?,SSOC ) <br />(WILDER) <br />PIPE 4" PVC SEWER <br />PLUG a" (PVC) SEWER BELL END <br />WYE �'." ALL GASKETED <br />Description <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />8.00 <br />28.00 <br />6.00 <br />28.00 <br />28.00 <br />6.00 <br />27.50 <br />1.00 <br />Total Labor Cost: <br />Cost <br />170.72 <br />356.44 <br />48.00 <br />238.00 <br />543.48 <br />98.58 <br />529.93 <br />21.63 <br />2006.78 <br />Date / Used Cost <br />-------- -------- ---------- <br />07/16/1996 2 4.82 <br />07/16�1996 1 2.23 <br />07/17/1996 1 233.29 <br />07/17/1995 1 755.30 <br />07/18/'_996 1 a9,'7g <br />0:'/19/1996 1 378.47 <br />07/2�1996 1 366 80 <br />07/16/1996 35 24.15 <br />07/16/1996 1 1.35 <br />07/16/1996 2 8.g2 <br />Total Material Cost: <br />Hours <br />V2047 89 GMC 515 1.00 <br />Cost <br />5.40 <br />1865.02 <br />' ISa3 4S <br />41.37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.