Laserfiche WebLink
Work Activity Work Order <br />ISSUBd By SJT2 SPOONER, JAMES T. <br />Issued Department aw PUBLIC WORKS <br />Date Issued sn�zo�z <br />Fund ao� Accounts Program <br />Program ur3a�s z s <br />Title CONVERT .75 INCH 2324 WALNUT ST UT3473-2-3 <br />Work Order No 20121984 Project Activity Type <br />Status 9mzoi2 Time oe:za Original WO __ __ __ <br />Type <br />V <br />V <br />Vehicle No Description <br />J0114 <br />J0115 <br />2012 FORD F550 I.5 TON 4X2 GAS <br />2012 INTERNATIONAI. DIESEL 5 YD <br />VACTORIINTER NATIONAL <br />Vehicle Costs <br />Hours <br />1.3 <br />1.3 <br />1.5 <br />Function <br />Page 3 <br />10/30/2012 11:05 <br />Activity <br />CORRECTIVE MAINTENANCE Sf8iU5 CL <br />Cost Billing Date Billing Ccde Warehouse <br />12.74 09124/2012 <br />25.48 09/2412012 <br />V H0050 2013 _ 95.895 09124/2012 --- -----.-_— <br />Total Vehicle Cost siaa.�z <br />Material Costs <br />Quanti Cost Billing Date Billing Code Warehouse <br />Type MaterNo Description_ _. -._ —Ty- �n,ea� osizsrzotz PAN <br />M ADAP34000647 ADAPTER 3/4 FIP X 3l4 IPS INSTA 1 <br />M ADAP34000547 ADAPTFR 314 MIP X 314 IPS INSTA 4 61.792 99125/2012 PAN <br />M BOXOOU154947 BOX METER MOLDED PLASTIC WIDI L 1 71.643 09R512912 PAN <br />M ELL03410d:47 ELBOW 314 NPT 90 DEG STREET BRA 2 9.912 09f25120i2 PAN <br />M METE34141847 METER 518 X 5l4 NEPTUNE WIE-C'�D 7 190.099 09I252072 PAN <br />M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 4 � 1.076 09/2512012 PAN <br />M SETT74149747 SETTER COPPER 5l8 X 314 (HEIGHT 7 100.778 09I2512012 PAN <br />� ---�— - — � TOt81 M0tBf181 COSt 5450J5 <br />Ty�e Na No Description __ _ <br />NA NIA 3/4 MINUS <br />Type <br />P <br />P <br />P <br />ID Name <br />BGM2 <br />HLJ <br />SCR <br />., <br />BEUKEP,S, GEORGE M. <br />HUSBY, L1NCE J. <br />SMITH, CAMERON R. <br />NA Costs <br />Quantity Cost Bi �'ng Date Dilling Code Warehouse <br />—75 ---- 17.31 09252012 <br />Total NA Cost sn.ai <br />Personnel Costs <br />Hours Cost Billing Date Earning Code Class <br />1.3 37.603 09/242012 <br />1.3 34.121 09/2412012 <br />1.3 29.437 091242012 <br />Totai Personnel Cost <br />Total Cost <br />5101.16 <br />$702.74 <br />