Laserfiche WebLink
Page 2 <br />Work Activity Work Order 10i16/2001 9 : 4 5 <br />Work Order Number 20012363 <br />EQUIPMENT: <br />ID DESCRIPTION Date Units Cost <br />MATERIAL: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />MISCELLANEOUS: <br />ID <br />DESCRIPTION <br />BRICK. 2.1/4 X 4 X 8 GREY CONC <br />CEMENT 20 MINUTE SET 50 LB. BA <br />DESCRIPTION <br />Sub Total <br />Date Units Cost <br />09/25/2001 3.00 $0.69 <br />09/25/2001 1.00 $11.8 <br />Sub Total $1253 <br />Date Units Cost <br />Sub Total $0.00 <br />