Laserfiche WebLink
THERMAL AND MOISTURE <br />PROTECTION <br />1 INSTALL PER 20121RC. IECC AND 2012 WSEC. <br />2 INSTALL FLASHING AND SHEET METAL IN COMPLIANCE WITH <br />'ARCHITECTURAL SHEET METAL MANUAL" BY SMACNA. <br />3. ALUMINIM FLASHING TO CONFORM TO ASTM B209 AND BE MIN..016 IN. <br />THICK STANDARD BUILDING SHEET OF PLAIN FINISH. <br />4 GALVANIZED SHEET FLASHING SHALL CONFORM TO ASTM A526. 20% <br />COPPER, 26 GAUGE (00179 IN) •• ASTM A525. DESIGNATED G90 HOT DIP <br />GALVANIZED MILL PHOSPHATIZED. <br />5 BACK PAINT FLASHINGS WITH BITUMINOUS PAINT OR WHERE EXPECTED <br />TO BE IN CONTACT WITH CEMENT1110US MATERIALS OR DISSIMILAR <br />METALS <br />6 PROVIDE AND INSTALL FLASHING AT ALL ROOF TO WALL CONDITIONS. <br />PROJECTIONS OF WOOD BEAMS THROUGH EXTERIOR WALLS. EXTERIOR <br />OPENINGS. AND ELSEWHERE AS REQUIRED TO PROVIDE WATERTIGHT <br />AND WEATHERPROOF PERFORMANCE. <br />7 ROOF VALLEY FLASHING SHALL BE PROVIDED OF NOT LESS THAN <br />No. 28 GALV. SHEET GAUGE CORROSION RESISTANT METAL OR <br />COPPER. <br />FLASHING SHALL EXTEND AT LEAST 11' FROM THE CENTER LINE OF <br />EACH WAY AND SHALL HAVE THE FLOW LINE FORMED AS PART OF <br />THE FLASHING. <br />SECTIONS OF FLASHING SHALL HAVE AN END LAP OF NOT LESS THAN <br />4 INCHES. <br />8. ENCLOSED ATTIC SPACES SHALL HAVE CROSS VENTILATION FOR <br />EACH SEPARATE SPACE BY VENTILATING OPENINGS PROTECTED <br />AGAINST THE ENTRANCE OF RAIN. <br />9. PROVIDE AND INSTALL INSULATION AT WINDOW SHIM SPACES <br />10. FIT INSULATION TIGHT WITHIN SPACES AND TIGHT TO AND BEHIND <br />MECHANICAL AND ELECTRICAL SERVICES WITH IN THE PLANE OF THE <br />INSULATION. LEAVE NO GAPS OR VOIDS. <br />I L PROVIDE SEALANTS AND CAULKING APPLICABLE SPECIFICATIONS <br />WHERE SHOWN ON THE DRAWING AND ELSEWHERE AS REQUIRED TO <br />PROVIDE A POSITIVE BARRIER AGAINST MOISTURE AND PASSAGE OF <br />AIR. <br />12, ALL DOORS AND WINDOWS TO THE EXTERIOR OR UNCONDITIONED <br />AREAS SHALL BE FULLY WEATHER STRIPPED, GASKETED OR OTHER. <br />WISE TREATED TO LIMIT AIR INFILTRATION. <br />13 PROVIDE WEATHERPROOF THRESHOLD AT ALL EXTERIOR SWING <br />DOORS <br />MECHANICAL <br />i. ALL HVAC EQUIPMENT AND DUCTWORK TO BE INSTALLED IN <br />ACCORDANCE WITH STATE AND LOCAL CODES AND ORDINANCES. <br />2. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL <br />DUCTWORK, PIPING AND ELECTRICAL REQUIREMENTS WITH ALL <br />OTHER TRADES PRIOR TO BEGINNING INSTALLATION TO AVOID <br />CONFLICTS AND INTERFERENCE WITH OTHER TRADES. <br />3. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND <br />EQUIPMENT NECESSSARY TO INSTALL PLUMBING. RELATED <br />FIXTURES, VENTILATION, ROOF AND FLOOR DRAINS. HEATING, <br />AND AIR CONDITIONING. <br />4. MECHANICAL EQUIPMENT MUST BE FIRMLY ATTACHED TO THE <br />STRUCTURE. ISOLATORS, FASTENERS AND ANY OTHER ELEMENT <br />PROVIDING STABILITY FOR MECHANICAL EQUIPMENT MUST BE <br />APPROVED BY ICBO OR EQUIVALENT TESTING PROCEDURE AND BE <br />CAPABLE OF TRANSMITTING CODE REQUIRED LOADS BUT IN NO <br />EVENT LESS THAN A SHEAR LOAD OF EQUIVALENT TO AT LEAST 0 3 <br />Y OPERATING WEIGHT OF EQUIPMENT. <br />5. TERMINAL HOOKUP OF ALL FIXTURES AND TAP INTO ALL UTILITIES IS <br />REQUIRED. <br />6. CONTRACTOR SHALL INSTALL AND CHECK ALL PRESSURE REDUCING <br />VALVES. POP OFF VALVES AND OTHER SAFETY DEVICES PRIOR TO <br />OPERATION OF SYSTEM <br />7. R403.2 1 Dun Insulation <br />Duns in a0¢5 shall be insulated to a muvmurn of R•8. <br />Exception Ducts a Portions thereof looted comcletely inside the <br />building thermal envelope. Duns dcaied In crawl spaces (Vented or <br />unvenleo) do not qualify for this exception. <br />8. MECHANICAL EQUIPMENT TO BE BALANCED AND TESTED AFTER <br />INSTALLATION TO ASSURE PROPER OPERATION. <br />9. COORDINATE EXACT LOCATION OF THERMOSTATS WITH OWNER. <br />10. EXAUST FANS ARE TO BE FURNISHED. INSTALLED AND DUCTED BY THE <br />MECHANICAL CONTRACTOR. EXHAUST FAN TO BE WIRED BY THE <br />ELECTRICAL CONTRACTOR. <br />11. EXHAUST FAN DISCHARGE AT LEAST 10 FEET AWAY FOR HVAC FRESH <br />AIR INTAKE <br />ELECTRICAL <br />1. ALL WORK SHALL COMPLY WITH THE 2008 NATIONAL ELECTRICAL <br />CODE. STATE AND LOCAL CODES AND ORDINACES. <br />2. CONTRACTOR SHALL PROVIDE AND INSTALL LABOR. MATERIALS. <br />AND EQUIPMENT NECESSARY TO INSTALL WIRING, RELATED <br />FIXTURES, ELECTRIC HEAT ELEMENTS AND CONTROL. <br />3 SUB -CONTRACTORS SHALL COORDINATE WORK WITH ALL <br />OTHER TRADES. <br />TERMINAL HOOKUP IS REQUIRED FOR ALL FIXTURES. APPLIANCES. <br />FANS AND CONTROLS. <br />VERIFY EXACT LOCATION OF ALL MOTORS AND EQUIP. PRIOR TO <br />ROUGHING IN. LIKEWISE APPRAISE ALL TRADES OF THE LOCATIONS <br />OF ELECTRICAL WORK THAT AFFECTS WALL THICKNESS. PLUMBING. <br />MECHANICAL. ETC. <br />4. MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED BY <br />UNDERWRITER'S LABORATORIES, INC. AND SHALL BEAR THEIR LABEL <br />WHEREVER STANDARDS HAVE BEEN ESTABLISHED AND THEIR LABEL <br />SERVICE IS REGULARLY FURNISHED. <br />S. ALL EQUIPMENT INSTALLED OUTDOORS AND EXPOSED TO THE <br />WEATHER SHALL BE WEATHER-PROOF. <br />6. ALL ELECTRICAL EQUIPMENT AND BREAKERS SHALL BE PROPERLY <br />LABELED. <br />7. CONTRACTOR TO PROVIDE PANEL DESIGN <br />8 VERIFY AND LOCATE ALL RECEPTACLES AT 12-TNCHES TO CENTER <br />LINE ABOVE THE FINISH FLOOR U.N 0. <br />9. VERIFY AND LOCATE ALL RECEPTACLES PRIOR TO INSTALLATION <br />OF DRYWALL 10 INSTALL LIGHT SWITCHES AT 424NCH ES TO CENTER <br />LINE ABOVE THE FINISH FLOOR U N.O. <br />11. ALL SWITCHED OUTLETS SHALL BE ONE-HALF HOT. <br />12. GFCI OUTLETS ARE REQUIRED AT ALL WET AREAS, GARAGES. <br />AND OUTDOORS <br />13. INSTALL RECEPTACLES IN BATHROOMS ABOVE THE WORK TOP <br />AND SHALL BE GROUND FAULT CIRCUIT INTERRUPTER (GFCI). <br />n <br />e <br />P <br />c o E <br />a <br />W n V <br />Q 2 0 <br />A <br />m o ^ E <br />� P <br />pOn�P <br />b�NPg <br />:vim o <br />a <br />W N V <br />S K <br />I <br />0 <br />DATE: <br />5/14/2014 <br />SCALE: <br />SHEET! <br />A-4 <br />