Laserfiche WebLink
Work Activity Work Order page 3 <br />10/30/2012 11:03 <br />Issued By SJ12 SPOONER, JAMES T. <br />Issued Department PW PUBLIC WORKS <br />Date Issued 9/7/2012 <br />Fund 401 Account 5 Program Function Activity <br />Program UT3473 2 3 <br />Title CONVERT .75 INCH 2410 WALNUT ST UT3473-2-3 <br />Work Order No 20121988 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status W712012 Time 06:42 Original WO Billing <br />Type <br />Vehicle No <br />Description <br />V <br />J0114 <br />2012 FORD F550 1.5 TON 4X2 GAS <br />V <br />J0115 <br />2012 INTERNATIONAL DIESEL 5 YD <br />V <br />H0050 <br />2013 VACTORIINTERNATIONAL <br />Vehic!e Costs <br />Hours <br />1.3 -- <br />1.3 <br />1.3 <br />Total Vehicle Cost <br />Material Costs <br />Cost Billing Date <br />12,74 09124/2012 <br />25.48 09/2412012 <br />83.109 09/24/2012 <br />$121.33 <br />Type <br />Maier No <br />Description <br />Quantity <br />M <br />ADAP34000647 <br />ADAPTER 314 FIP X 314 IPS INSTA <br />1 <br />M <br />ADAP34000547 <br />ADAPTER 3/4 MIP X 314 IPS INSTA <br />4 <br />M <br />bOX000154347 <br />BOX METER MOLDED PLASTIC W/DIL <br />1 <br />M <br />ELL034104247 <br />ELBOW 314 NPT 90 DEG STREET BRA <br />2 <br />M <br />PIPE34060647 <br />PIPE 314 POLY IPS 200 PSI SIDR7 <br />4 <br />M <br />SETT34149747 <br />SETTER COPPER 518 X 3/4 (HEIGHT <br />1 <br />Code Warehouse <br />Cost Billing Date Billing Code Warehouse <br />14.847 <br />09/25/2012 <br />PAN <br />61.792 <br />09125/2012 <br />PAN <br />71.643 <br />09/25/2012 <br />PAN <br />9.912 <br />09/25"012 <br />PAN <br />1,076 <br />09/2512012 <br />PAN <br />100,778 <br />09125/2012�� <br />PAN <br />Total Material Cost <br />NA Costs <br />Type Na No Description Quantity _Cost Billing Date Billing Code Warehouse_ <br />NA NIA 3M MINUS .75 17.31 0912512012 <br />NA N/A TOPSOIL .13 2.343 092512012 <br />Total NA Cost <br />$19.65 <br />Personnel Costs <br />Type <br />ID <br />Name Hours <br />Cost <br />Billing Date Earning Code Class <br />P <br />BGM2 <br />BEUKERS, GEORGE M. 1.3 <br />37.603 <br />0924I2012 <br />P <br />HLJ <br />HUSBY, LANCE J. 1.3 <br />34.121 <br />09/24/2012 <br />P <br />SCR <br />SMITH, CAMERON R. 1.3 <br />29.437 <br />09/24/2012 <br />Total Personnel Cost <br />$101.16 <br />Total Cost <br />$502.19 <br />4 <br />