Laserfiche WebLink
ryan Construction <br /> Page 2 of 3 <br /> 6. The attached floor plan shows 2x12 F.J. at 16" O.C. where the original <br /> drawings show 14" deep floor trusses at 19.2" O.C. Clarify on all sheets of <br /> drawing set which rype(s) of construcuon aze to be used for this special <br /> project. <br /> 7. Delete all details and notes that aze not applicable to this project. <br /> 8. Provide 1'h"-2" diameter handrail up 34" min, 38" max above tread sing. <br /> Return ends. <br /> 9. Plans do not show the insulation level in the exterior walls. <br /> 10. Ceiling insulation is required to extend to the outer surface of the exterior <br /> walls. <br /> 11. When eave vents are installed, baffling of the vent openings shall be provided <br /> s.� as to deflect the incoming air above the surface of the insulation. The <br /> baffles shall be installed from the top of the ouuide of the exterior wall, <br /> extending inward, to a point six inches vertically above the height of <br /> noncompressed insulation, and twelve inches vertically above loose fill <br /> +nsulation. <br /> 12. Plans do not show how the requirements of the Washington State Ventilation <br /> and Indoor Air Quality Code (VIAQ) aze net. Show size and location of the <br /> whole house fan and all source specific fans. Show how oucside air is supplied <br /> to the dwelling (fresh air ports, integrated forced air). <br /> 13. Specify all posdbeam connections, posdfooting connections. A positive <br /> connection is required for uplift and lateral support. <br /> 14. The plans do not clearly show which windows are used at each location. <br /> Provide window schedule specifying size and location of all windows. <br /> I5. Show all posts on plan including built-up 2x members. <br /> 16. Provide non-combustible hearth at fireplace and specify type of fireplace <br /> proposed. Provide appropriate details andlor section drawings. <br /> In order for the processing of your application to continue, i[ will be necessary to <br /> provide the Building Division w�th two complete new se[s of drawings reflecting the <br /> corrections requested. <br /> Upon resubmittal of the drawings, your application will be given priority and plan <br /> review recommence. <br />