Laserfiche WebLink
CLOSED CM WORR ORDfiR3 REPORT <br /> Total Utility Maintenance Management System <br /> 02/O1/1996 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range : O1/09/1989 - O1/31/1996 <br /> CM Work Order Range :1001091070001 - UT2608- - Pattern :7101196750468 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ________________________________________________________________________________ <br /> CM WORK ORDER ID: 7101196750468 Title: CONVERT 1311 RUCKER �(V� <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function .119 Activity 675 <br /> Date Completed: O1/22/1996 <br /> Overal7. Craft: <br /> Isaued: 10/23/1995 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time : 0.00 Hr. <br /> Meter RCading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST At;E ALLEN, GARY E. 0 .00 2 . 00 40.42 <br /> UL CS� CAVANAH, SHANE G. 0 . 00 2 . 00 24 .24 <br /> UL DMJ DOUCETTE, MARK J 0 .0� 2 . 00 29.42 <br /> SUP2 GJ GARZA, JOHN (NMI) O .UO 1 .00 24 .46 <br /> Total Labor Cost : 118.54 <br /> Materiale: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ Ol/22/1996 4 30.40 <br /> BOX000056247 HOX METER PLA 15" X 10" W/LID O1/22/1996 1 13 .01 <br /> COUP32137647 COUPLING 1/2"COP X 3/4"MIP @ O1/22/1996 1 4 .82 <br /> COUP.i4004247 COUPLING 3/4" FIP X COP ELL � O1/22/1996 1 4 .26 <br /> COUP34004347 COUPLING 3/4" MIP X COP ELL Q Ol/22/1996 1 3 .83 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 O1/22/1996 1 30.85 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. O1/22/1996 6 1. 56 <br /> VALV34008648 VALVE METR 3/4" L/W FLARD COP@ Ol/22/1996 2 21.46 <br /> Total Material Cost: 110 . 1� <br /> Vehiclas: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V0017 94 FORD AEROSTAR VAN 1 .00 6 . 00 <br /> Total Vehicle Cost : 6 . 00 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> CARRYOVER TO 1996 . N(i 1995 MATERIALS TO JOURNALIZE. <br />