Laserfiche WebLink
4. <br />b� <br />6. <br />� <br />( <br />PUBLIC WORKS PEitMIT COMMENTS <br />Connect side sewer per City Standard #G01. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspc�ts to the side sewer. <br />Connect rooftop downspo�ts to the drainage system provided for this lot. <br />B. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />/ 9, J The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />�� beginning the project. Call Rand Alten at 425-339-7403 // Call Cliff lindman at 425-339-7404. <br />Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is ailowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No building materials to be stacked on sidewalk/roadway and sidewalklroadway to be kept clean and <br />open for pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. <br />19. <br />20. <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />Pave to existing paving in alley. <br />21. Contact the _ <br />sewer services. <br />22. <br />23. <br />24. <br />Water District for connecting provisions for this building's water and <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhoie, then <br />gravity Flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D. <br />PWCanmenis / Revised 618117 <br />